Name | Type | Posted | Actions |
|---|---|---|---|
1305M326Q0029 Amendment 0001 FINAL.pdf | May 19, 2026 | ||
Attachment 2 - Site Photos for UPS Replacements.pdf | May 8, 2026 | ||
Attachment 1 - PWS MRX OHX and FFC UPS Replacement.pdf | May 8, 2026 | ||
Combined Synopsis Solicitation 1305M326Q0029 FINAL.pdf | May 8, 2026 |
Uninterrupted Power Supply Replacements at Morristown (MRX), Nashville (OHX), and Atlanta, GA (FFC)
Contact and place of performance
Jack Huckleby
Fort Worth, TX 76102
USA
This requirement is for the National Oceanic and Atmospheric Administration (NOAA), National Weather Service (NWS) Southern Region (SR), Weather Forecast Offices (WFO) at the Morristown (MRX), Nashville (OHX) and Atlanta (FFC) locations. The purpose of this requirement is to supply and install the Eaton 93PM UPS system, with lithium battery backup for 15 minutes, at each of the three WFO locations as well as provide the removal and disposal of the existing UPS’s, battery cabinet with batteries and any associated debris.
See Attached Combined Synopsis Solicitation 1305M326Q0029 FINAL
The National Oceanic and Atmospheric Administration (NOAA) issued solicitation 1305M326Q0029 to secure the replacement of uninterrupted power supply (UPS) systems at three National Weather Service Southern Region Weather Forecast Offices. The project scope involves the supply and installation of Eaton 93PM UPS systems, equipped with lithium battery backups providing 15 minutes of power, at locations in Morristown (MRX), Nashville (OHX), and Atlanta (FFC). Additionally, the contractor is responsible for the removal and disposal of all legacy UPS units, battery cabinets, batteries, and associated debris from these sites.
This requirement is a WOSB (Woman-Owned Small Business) set-aside classified under NAICS 335910 for Battery Manufacturing and PSC 6140 for BATTERIES, RECHARGEABLE. While the physical installations are located at the Morristown, Nashville, and Atlanta offices, the primary place of performance is listed as Fort Worth, Texas. The response deadline for this combined synopsis/solicitation is June 5, 2026, with Jack Huckleby serving as the point of contact. The solicitation package includes four attachments providing the performance work statement, site photographs, and an amendment finalized on May 19, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.