Name | Type | Posted | Actions |
|---|---|---|---|
1240LT26Q0061_A0001.pdf | May 4, 2026 | ||
Attach 5 _IMG_0615.jpeg | JPEG | May 4, 2026 | |
C6 Attachment 2 - Schedule of Items_4.23.2026.xlsx | XLSX | Apr 27, 2026 | |
C12 Attachment 4 - DBA Wage Determination - Grand County CO.pdf | Apr 27, 2026 | ||
C5_Combined Synopsis 1240LT26Q0061.pdf | Apr 27, 2026 | ||
C6 Attachment 1 - Statement of Work_4.23.2026.pdf | Apr 27, 2026 | ||
C6 Attachment 3 - Specifications.pdf | Apr 27, 2026 |
Shadow Mountain Building 97 Heat Cable and Snow Retention, Grand Lake, CO
Contact and place of performance
Holly Hlavac
Grand Lake, CO
USA
Amendment 00001 (A0001) - A Site Visit will be held on May 12th, 2026 at 1100 AM MDT. All interested parties are to meet at: 34 Co Rd 66, Grand Lake, CO 80447 AND contact Juan Londono @ [email protected] to confirm attendance. Refer to Attach 5 for meeting location. ALL DOCUMENTS ARE LOCATED IN ATTACHMENTS/LINKS Project Title: Shadow Mountain Building 97 Heat Cable and Snow Retention...
View morePSC Code: 5650 -Roofing and Siding Materials
NAICS Code: 238210 - Electrical Contractors and Other Wiring Installation Contractors
Size Standard: $19M
Project Magnitude: Between $25,000 and $100,000
The U.S. Forest Service, through the USDA-FS CSA Intermountain 8 office, is issuing solicitation 1240LT26Q0061 for the installation of heat cable and snow retention systems at Shadow Mountain Building 97 in Grand Lake, Colorado. This requirement is designated as an SBA Small Business Administration set-aside and is classified under NAICS 238210 Electrical Contractors and Other Wiring Installation Contractors and PSC 5650 Roofing and Siding Materials. The contractor is responsible for providing all labor, materials, equipment, and oversight to install heat tape and cabling systems on the roof, gutters, and downspouts of the north and south sections of the building. The project magnitude is estimated between $25,000 and $100,000.
The scope of work includes reconditioning the electrical system to provide dedicated power to both sides of the building to ensure full functionality of the heating systems and the installation of new snow retention guards on the north and south elevations. Responses to this combined synopsis/solicitation are due by June 2, 2026. A site visit is scheduled for May 12, 2026, at 34 County Road 66 in Grand Lake, and attendees must contact Juan Londono to confirm attendance. The primary point of contact for this notice is Holly Hlavac. Supporting documentation consists of seven attachments, including a statement of work, schedule of items, and Davis-Bacon Act wage determinations.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.