General Services Administration (GSA) Seeks to Lease the Following Space in Bozeman, MT
Contact and place of performance
Amy Hascall
Bozeman, MT
USA
State: Montana City: Bozeman Delineated Area: City boundaries of Bozeman, MT *See DA map attached* Minimum Sq. Ft. (ABOA): 2,350 SF Maximum Sq. Ft. (ABOA): 2,468 SF Space Type: Office Parking Spaces (Total): 3 Full Term: 180 months Firm Term: 120 months Additional Requirements: SPACE REQUIREMENTS A. All space must be contiguous, and preferably on the 2nd floor or higher. Space on the first floor will be considered on...
View moreL. Future ceiling, floor slab, or demising wall penetrations through Tenant’s secured perimeter will
not be permitted.
M. If floor slab does not extend to the skin of the building, additional security measures will be
required to meet forced entry protection, Tenant Security sound attenuation requirements, and
RF requirements.
N. The space will be provided with file safes weighing between 850 lbs and 1,000 lbs each.
Although safes will be dispersed throughout the office, floor load of the proposed site must be
capable of supporting this additional weight. The quantity and location of safes may change
over the course of the lease. The Lessor shall provide the Tenant with a floor plan showing
locations where the safes can be located.
O. Tenant’s regular business hours are 7:00 AM to 5:30 PM; however, 24-hour access to the
space and any provided elevator service must be available 365 days per year.
P. One (1) elevator must be provided with override control. If the office is located on the 6th floor
or above, elevator must be on emergency power.
SITE REQUIREMENTS
A. Proposed site must not be within 640’-0” of any facilities identified by ISC as “hazardous
materials transportation/storage facilities.”
1. Hazardous locations include facilities with potential environmental threats (e.g., fuel storage
areas, gas stations, chemical manufacturing facilities, and railroad lines transporting
hazardous material).
2. Special consideration should be given to exclude sites located near hazardous areas, such
as bulk storage sites (e.g., hazardous materials storage sites, water purification centers,
above-ground fuel storage, and rail yards).
3. It is preferred that the proposed facility not be located near “Low Risk Facilities” (e.g., day
care centers, senior centers, schools, hospitals, and religious/rehabilitation/social service
centers).
B. Proposed facility must not be located within 400’-0” of public defenders, ICE, probation offices,
IRS, universities, other businesses, or facilities, deemed unacceptable by Tenant Security for
safety purposes. This requirement may be waived by Tenant Security if no other facility is
deemed acceptable. In those cases, enhanced security requirements may be necessary.
C. Proposed Tenant spaces or facilities within 400’-0,” or adjacent to facilities associated with
foreign powers identified in Tenant's National Security Threat List, will not be considered.
D. For proposals of new construction of a standalone facility:
1. Standoff distance may be required from defended perimeter to the façade of the building to
house the Tenant office, if required by FSL rating.
2. Defended perimeter must be measured as the distance from building to boundary
protected by bollards, planters, or other barriers approved by Tenant.
E. For proposals of space in existing buildings, standoff distance must be provided from the curb
line or nearest point accessible by a vehicle to the façade of the building to house the Tenant
office.
F. Space shall have a minimum setback of at least 20 feet, where the setback will be measured from the interior perimeter wall of occupied Tenant space to any point where an unscreened or otherwise unauthorized vehicle can travel or park. This requirement may be waived by Tenant Security.
PARKING
A. Uncontrolled underground or uncontrolled under-building parking is not permitted for facilities
with FSL III, IV, or V ratings. A standalone or mixed-tenant facility with uncontrolled
underground or under-building parking should not be considered for a facility with an FSL I or II.
B. A mixed-tenant facility with public parking withing 30 feet of the interior perimeter wall must not
be considered for a facility with an FSL III, IV, or V rating. A mixed-tenant facility with public
parking within 20 feet of the interior perimeter wall must not be considered for a facility with an
FSL I or II rating.
C. A stand-alone facility with public parking within 100 feet of the facility must not be considered
for a facility with an FSL III, IV, or V rating. This requirement may be waived by Tenant Security
if no other facility is deemed acceptable. In those cases, enhanced security requirements may
be necessary.
Expressions of interest must include the following information:
Building name and address and location of the available space within the building
Rentable square feet available and expected rental rate per rentable square foot, fully serviced
ANSI/BOMA office area (ABOA) square feet to be offered and expected rental rate per ABOA square foot, fully serviced.
Indicate whether the quoted rental rate includes an amount for tenant improvements and state the amount (if any)
Date of space availability
Building ownership information
Amount of parking available on-site and its cost. Include whether expected rental rate includes the cost of the required Government parking (if any)
Energy efficiency and renewable energy features existing within the building
List of building services provided.
The U.S. Government currently occupies office and related space in a building under a lease in Bozeman, MT, that will be expiring. The Government will consider alternative space if economically advantageous. In making this determination, the Government will consider, among other things, the availability of alternative space that potentially can satisfy the Government’s requirements, as well as costs likely to be incurred through relocating, such as physical move costs, replication of tenant improvements and telecommunication infrastructure, and non-productive agency downtime.
Offered space must meet Government requirements for fire safety, accessibility, seismic, and sustainability standards per the terms of the Lease. A fully serviced lease is required. Offered space shall not be in the 100 year flood plain.
Entities are advised to familiarize themselves with the telecommunications prohibitions outlined under Section 889 of the FY19 National Defense Authorization Act (NDAA), as implemented by the Federal Acquisition Regulation (FAR). ). For more information, visit: https://acquisition.gov/FAR-Case-2019-009/889_Part_B.
Expressions of Interest Due: Monday, June 29, 2026; 5:00PM PST
Market Survey (Estimated): TBD
Occupancy (Estimated): February 1, 2027
Send Expressions of Interest to:
Amy Hascall, Leasing Specialist
Email Address: [email protected]
Government Contact Information
Lease Contracting Officer: Joel Wilson
Leasing Specialist: Amy Hascall
The General Services Administration (GSA) Public Buildings Service is seeking expressions of interest for a fully serviced lease of office space in Bozeman, Montana. The requirement specifies a minimum of 2,350 and a maximum of 2,468 American National Standards Institute/Building Owners and Managers Association (ABOA) square feet of contiguous office space, preferably located on the second floor or higher. The government currently occupies space in Bozeman and will consider alternative locations if they prove economically advantageous after accounting for relocation costs, tenant improvements, and telecommunication infrastructure replication. The anticipated performance period includes a 180-month full term with a 120-month firm term, with an estimated occupancy date of February 1, 2027.
The procurement is classified under NAICS code 531120, Lessors of Nonresidential Buildings (except Miniwarehouses), and PSC code X1AA, Lease/Rental of Office Buildings, with no set-aside used. The proposed site must be within the city boundaries of Bozeman and comply with extensive security requirements, including specific standoff distances from hazardous materials, public areas, and certain high-risk facilities. Additional specifications include three parking spaces, floor load capacity for file safes weighing up to 1,000 pounds, and 24-hour access to the space 365 days a year. Buildings of wood joist construction, historical status, or those requiring "Open Storage Secure" postures must meet enhanced forced entry and sound attenuation standards.
Expressions of interest for solicitation 4MT0170 are due by 5:00 PM PST on June 30, 2026, and must be submitted to Leasing Specialist Amy Hascall. Submissions must include building details, rentable and ABOA square footage, rental rates, energy efficiency features, and ownership information. All offered space must meet federal standards for fire safety, accessibility, seismic stability, and sustainability, and cannot be located within a 100-year flood plain. Documentation provided for this notice includes a draft map of the delineated area.