KIT, FURNITURE BOM
DLA Maritime - Puget Sound is procuring a furniture kit and installation services for the Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS&IMF). This 100% small business set-aside, solicitation SPMYM226Q7516, involves Phase 2 of the B850 Room 400 renovation. The firm-fixed-price contract covers furniture procurement, assembly, and CAT6 cabling. Work is divided into four CLINs: design/submittals, material procurement, installation labor, and cabling. Completion is required by June 22, 2026, with quotes due June 12, 2026. Requirements include a 114-item Bill of Materials and compliance with the PSNS&IMF Contractor Guide to Environmental and Safety Compliance. Submissions must include manufacturer traceability and SAM registration. Quotes must include manufacturer traceability and technical specification sheets. DLA Maritime Puget Sound is procuring furniture and low-voltage cabling for Phase 2 of the B850 Room 400 renovation. This firm-fixed-price contract includes design, kitting, assembly, and IT/phone cabling. New furniture must match the Phase 1 installation at PSNS&IMF.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Vera Anderson
Bremerton, WA
USA
SOLICITATION FOR COMMERICAL ITEMS DLA MARITIME PUGET SOUND intends to procure, KIT, FURNITURE BOM , manufactured in accordance with material specifications and to be provided and delivered in accordance with all attached document(s) here within. The solicitation will be issued as; 100% TOTAL SMALL BUSINESS SET ASID E using commercial and simplified acquisition procedures in accordance with FAR Parts 12 an...
View moreOffers wishing to submit a quote are responsible for downloading their own copy of the RFQ and for frequently monitoring the site for any amendments.
IN ORDER TO BE DEEMED RESPONSIVE, THE SOLICITATION MUST BE COMPLETED IN ITS ENTIRETY, AND MUST INCLUDE THE FOLLOWING (All responsible sources interested in submitting offers must):
In order to be considered for award, IF the contractor (awardee) is required to implement NIST SP 800-171, the contractor (awardee) shall have a current assessment as detailed in DFARS 252.204-7019 {I.E., not more than 3 years old unless a lesser time is specified in the solicitation)
**Items deemed to be Commercial Off The Shelf (COTS) are exempt from NIST SP 800-171 requirement. Must identify and provide information to contracting officer on bid during solicitation period**
REQUEST FOR MANUFACTURE TRACEABILITY
If you are not the manufacture, in accordance with DLAD subpart 11.3, please provide traceability to the manufacture and part number.
The information below provides a few examples of acceptable documentation:
1. Letter from the approved source stating you are an authorized dealer.
2. If offered item(s) are "not in stock" or "not yet manufactured", provide a copy of your Request for Quotation to the approved source cited in the item description; and an original, hard copy of quotation received by you from the approved source cited in the item description; or other verifiable documentation of quotation.