Name | Type | Posted | Actions |
|---|---|---|---|
Attachment_2_Statement_of_work.pdf | Jun 18, 2014 | ||
Attachment_6_Supplemental_Specifications.pdf | Jun 18, 2014 | ||
Attachment_4_Drawings.pdf | Jun 18, 2014 | ||
Attachment_5_Sketches.pdf | Jun 18, 2014 | ||
Attachment_3_Map.pdf | Jun 18, 2014 | ||
AG82ATS140018_Part_2_of_2.pdf | Jun 18, 2014 | ||
Attachment_7_Wage_Determination.pdf | Jun 18, 2014 | ||
Attachment_1_Schedule_of_Items.pdf | Jun 18, 2014 | ||
AG82ATS140018_Part_1_of_2.pdf | Jun 18, 2014 | ||
Example_of_Instream_Work_with_typical_equipment.jpg | JPG | Jun 11, 2014 | |
Jenny_Creek_crossing_approach_needs_armoring.jpg | JPG | Jun 11, 2014 | |
Example_creating_instream_habitat_structure.jpg | JPG | Jun 11, 2014 | |
Example_decompacted_road.jpg | JPG | Jun 11, 2014 | |
Jenny_Creek_Area_needing_pools_logs_strmbank_work.jpg | JPG | Jun 11, 2014 | |
Jenny_Creek_area_needing_streambank_reconstruction.jpg | JPG | Jun 11, 2014 | |
Jenny_Creek_crossing_needs_lowering_and_narrowing.jpg | JPG | Jun 11, 2014 | |
Jenny_Creek_section_needing_avulsion_plug.jpg | JPG | Jun 11, 2014 | |
Target_Habitat_Conditions1.jpg | JPG | Jun 11, 2014 | |
Target_Habitat_Conditions3.jpg | JPG | Jun 11, 2014 | |
Attachment_5_Sketches.pdf | Jun 4, 2014 | ||
Attachment_6_Supplemental_Specifications.pdf | Jun 4, 2014 | ||
AG82ATS140018_part_2_of_2.pdf | Jun 4, 2014 | ||
Attachment_4_Drawings.pdf | Jun 4, 2014 | ||
Attachment_3_Map.pdf | Jun 4, 2014 | ||
Attachment_7_Wage_Determination.pdf | Jun 4, 2014 | ||
Attachment_2_Statement_of_work.pdf | Jun 4, 2014 | ||
Attachment_1_Schedule_of_Items.pdf | Jun 4, 2014 | ||
AG82ATS140018_part_1_of_2.pdf | Jun 4, 2014 |
Jenny Creek Instream Rehabilitation and Restoration
Contact and place of performance
Kasey E. Koch
FORT COLLINS, CO 80526
USA
Ammendment 3 CHANGES: Correction/Clairification to start and ending dates. The anticipated start date is on or around September 1, 2014 and will run consectutively for 45 days from the date the Notice to Proceed is issued. AMENDMENT 2 CHANGES: 1) Amend start date, start date dependent upon stream flow levels. 2) Changes to provisions to allow work 7 days a week. 3) Revisions to Attachment 1 Schedule of Items and Atta...
View moreThe Forest Service, Arapaho and Roosevelt National Forest, issued this sources sought notice under solicitation number AG-82AT-S-14-0018 for the Jenny Creek Instream Rehabilitation and Restoration project. This requirement involves the restoration of a one-mile segment of Jenny Creek on the Arapaho National Forest that has been impacted by motorized use. The scope of work includes approximately 1,900 feet of active channel work, stream bank treatments, riparian enhancement, and upland restoration. The project is located approximately seven miles west of Rollinsville, Colorado, and two miles off Rollins Pass Road. This opportunity is classified under NAICS 115310 Support Activities for Forestry and PSC F, and it is designated as an SBA SBA set-aside.
The contractor must provide all labor, materials, equipment, transportation, and management necessary to perform the services, though the government will furnish the seed mix required for upland restoration. The anticipated performance period begins on or around September 1, 2014, and runs for 45 consecutive days from the date the Notice to Proceed is issued. The actual start date is dependent upon stream flow levels, and the contract terms allow for work to be performed seven days a week. Responses to this notice are due by July 5, 2014. Documentation for this requirement includes 28 attachments, including a statement of work, drawings, sketches, maps, and supplemental specifications.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.