Name | Type | Posted | Actions |
|---|---|---|---|
Sol_140A2326R0023_Amd_0005.pdf | Jun 16, 2026 | ||
IE056-HES-PG_Safety-_-Flood_Prev_Impr_Phase-II--Reference_Drawings_SF_Measurments_-_Rev-6_0005.pdf | Jun 16, 2026 | ||
ATTACHMENT_11_REVISED_SOW_06162026_0005.docx | DOCX | Jun 16, 2026 | |
Sol_140A2326R0023_Amd_0004.pdf | Jun 8, 2026 | ||
Sol_140A2326R0023_Amd_0003.pdf | Jun 5, 2026 | ||
Sol_140A2326R0023_Amd_0002.pdf | Jun 4, 2026 | ||
Attachment_12_Questions_and_Answers_Log-JEVED-C_Goelz-2026-06-04_0002.xlsx | XLSX | Jun 4, 2026 | |
Copy_of_Attachment_2_Questions_and_Answers_Log-Tepa_EC-C_Goelz-2026-06-03_0001.xlsx | XLSX | Jun 3, 2026 | |
Sol_140A2326R0023_Amd_0001.pdf | Jun 3, 2026 | ||
Attachment_3_SF24_Bid_Bond.pdf | May 28, 2026 | ||
Attachment_2_Questions_and_Answers_Log.xlsx | XLSX | May 28, 2026 | |
Sol_140A2326R0023.pdf | May 28, 2026 | ||
Attachment_10_HES_Drawings_Phase_I.pdf | May 28, 2026 | ||
Attachment_9_IA_-_IEE_Representation_Form.pdf | May 28, 2026 | ||
Attachment_8_IA_Form_3000_Material_Approval_Submittal.pdf | May 28, 2026 | ||
Attachment_7_Wage_Determination.pdf | May 28, 2026 | ||
Attachment_6_SF1413_Statement_and_Acknowledgement.pdf | May 28, 2026 | ||
Attachment_5_SF25A_Payment_Bond.pdf | May 28, 2026 | ||
Attachment_4_SF25_Performance_Bond.pdf | May 28, 2026 | ||
Attachment_1_Statement_of_Work.pdf | May 28, 2026 |
C--Playground and Flood Prevention - Havasupai Elemen
Contact and place of performance
Hoptowit, Yui
Not specified
Playground and Flood Prevention Phase I
The Bureau of Indian Affairs, specifically the Indian Education Acquisition Office, has issued solicitation 140A2326R0023 for Phase II of the Playground Safety and Flood Prevention Improvements at Havasupai Elementary School. This project involves specialized heavy and civil engineering construction to address site safety and environmental protection. The requirement is classified under NAICS 237990 for Other Heavy and Civil Engineering Construction and PSC C1CA for Architect and Engineering-Construction: Schools.
The procurement process is managed by contracting officer Yui Hoptowit, with a final response deadline set for July 2, 2026. The technical scope, as detailed in the revised Statement of Work and reference drawings, focuses on safety enhancements and flood mitigation infrastructure. The solicitation file includes 20 total attachments, featuring multiple amendments and engineering measurements updated through June 16, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.