Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Apr 28, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 28, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 28, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912DY26RA063¬iceType=SolicitationNotice | LINK | Apr 28, 2026 |
W912DY26RA063
Contact and place of performance
Lynn Thomas
92277
The US Army Corps of Engineers, Engineering and Support Center, Redstone Arsenal, AL, has been tasked with initiating a Facility Reduction requirement at the USMC, Twentynine Palms, California.Pre-Demolition Surveys according to the requirements set forth in the Performance Work Statement (PWS) is for various buildings at the site. The objective is to plan and complete the environmental sampling of facilities at the...
View moreThe U.S. Army Corps of Engineers, Engineering and Support Center, Huntsville, issued solicitation W912DY26RA063 for a facility reduction requirement at the USMC base in Twentynine Palms, California. The project involves conducting pre-demolition surveys and environmental sampling for various buildings to support site preparation and demolition activities. This solicitation is a WOSB Woman-Owned Small Business set-aside under NAICS code 238910 Site Preparation Contractors and PSC P400 SALVAGE- DEMOLITION OF BUILDINGS.
The contractor is responsible for planning and completing environmental sampling to identify asbestos-containing materials (ACM), other regulated materials (ORM), RCRA 8 metals, lead-based paint, and PCBs-in-paint. Work includes comprehensive sampling of facility exteriors, roofs, and basements to quantify contamination and determine safe removal and disposal methods in accordance with federal, state, and local regulations. Following laboratory testing and analysis, the contractor will deliver a Pre-Demolition Assessment Report detailing the results of the site investigation and identifying any inaccessible areas within the structures.
Responses to this solicitation are due by May 7, 2026. Lynn Thomas serves as the primary point of contact for the requirement, which was published on April 28, 2026. Documentation for this notice includes one PDF attachment.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.