6110--Variable Frequency Drive Units VA Connecticut Healthcare System West Haven VA Medical Center
Contact and place of performance
Yolanda Rankin
West Haven 06516
Amendment No.: 0001 Solicitation No.: 36C24126Q0551 Date: June 11, 2026 Purpose of Amendment The purpose of this amendment is to provide responses to questions submitted regarding the solicitation. As a result of these questions and responses, the response due date will remain unchanged, as June 16, 2026. Question: For evaluation of technician qualifications, please clarify what documentation the Government expects t...
View moreThe Department of Veterans Affairs has issued solicitation 36C24126Q0551 for the procurement and installation of variable frequency drive (VFD) units at the West Haven VA Medical Center in Connecticut. This requirement is classified under NAICS 238220, Plumbing, Heating, and Air-Conditioning Contractors, and PSC 6110, Electrical Control Equipment. The opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBC). Responses are due by June 16, 2026, following a recent amendment published on June 11, 2026, that provided clarifications regarding technical qualifications and control scope.
The selected contractor is responsible for the physical installation and integration of new VFD control wiring into the existing Johnson Controls building automation system (BMS) infrastructure. While the contractor must provide all necessary field wiring terminations and coordination to facilitate the connection, the government's existing controls contractor will manage subsequent programming and software modifications for automatic operation. Proposals must include documentation for each technician performing work, specifically detailing relevant experience, current factory certifications, and Original Equipment Manufacturer (OEM) training certificates applicable to the equipment.
The performance of this contract will take place in West Haven under the management of the VA Connecticut Healthcare System. Yolanda Rankin is the designated point of contact for this combined synopsis/solicitation. Two attachments have been issued as part of the solicitation process: the initial document posted on June 3, 2026, and an amendment document posted on June 11, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.