Name | Type | Posted | Actions |
|---|---|---|---|
Combined Synopsis _Solicitation_T-142 updated_1.docx | DOCX | May 18, 2026 | |
Combined Synopsis _Solicitation_T-142 updated.docx | DOCX | May 14, 2026 | |
T-142 Tube 11645130_E.pdf | May 5, 2026 | ||
T-142 Track Shoe Body 11645129_E.pdf | May 5, 2026 | ||
Drawing 11645128.pdf | Apr 23, 2026 | ||
Combined Synopsis _Solicitation_T-142.docx | DOCX | Apr 23, 2026 |
T-142 Track Shoe Block
Contact and place of performance
Randy Reece
Texarkana, TX 75501
USA
T-142 Track Shoe Block, part number 11645128 Rev C, produced to the specifications of drawing 11645128 Rev C, in accordance with Quality Assurance Requirement (QAP) 11645128, accompanied with a Certificate of Conformance (CoC). Early delivery is acceptable at no additional cost to the Government. FY26 – 24,000 each Receive 2,400 Shoe blocks by November 2nd. Receive 3,600 Shoe blocks by December 2nd. Receive 3,6...
View moreThe Department of the Army, specifically the ACC RRAD, is soliciting for the procurement of 24,000 T-142 Track Shoe Blocks under solicitation number W911RQ26QA012. These components, identified by part number 11645128 Rev C, must be produced according to the specifications of drawing 11645128 Rev C and in compliance with Quality Assurance Requirement 11645128. All items require a Certificate of Conformance upon delivery to Texarkana, TX. This requirement is classified under NAICS 332111 Iron and Steel Forging and PSC 2530 Vehicular Brake, Steering, Axle, Wheel, and Track Components.
The performance schedule for the 24,000 units is distributed across Fiscal Year 2026. Deliveries begin with 2,400 shoe blocks due by November 2nd, followed by six monthly installments of 3,600 units each from December 2nd through May 2nd. Early delivery is permitted at no additional cost to the government. Supporting documentation for this combined synopsis/solicitation includes six attachments consisting of technical drawings for the shoe body and tubes, as well as updated solicitation files.
Responses to this solicitation are due by May 28, 2026. The primary point of contact for this notice, which was originally published on April 23, 2026, and last updated on May 18, 2026, is Randy Reece. Detailed requirements for the manufacturing and quality assurance of the track shoe blocks are specified in the associated drawings and quality assurance documents provided in the notice metadata.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.