Burnsville Rip Rap
Contact and place of performance
Travis Adkins
26631
Contractor shall provide all labor, equipment, and materials required to deliver Stone within 30 days post award, to U.S. Army Corps of Engineers Burnsville Lake Project. Contractor shall notify the government point of contact 5 business days prior to delivery to allow time for the project to get equipment rented to place the stone. The stone being delivered to Falls Mill will need to be delivered on a schedule to re...
View moreThe U.S. Army Corps of Engineers, Huntington District, is soliciting for the procurement and delivery of stone for the Burnsville Lake Project under solicitation number W9123725QA054. This requirement is an SBA Small Business Administration set-aside classified under NAICS code 327991 for Cut Stone and Stone Product Manufacturing and PSC 5610 for MINERAL CONSTRUCTION MATERIALS, BULK. The contractor must provide all necessary labor, equipment, and materials to supply 500 tons of 12–24-inch riprap and 50 tons of 3-inch crusher run to Falls Mill, as well as 250 tons of 6–12-inch riprap and 400 tons of 57 clean gravel to Bulltown Campground.
All materials must be delivered within 30 days of the contract award, and the response deadline for this solicitation is August 21, 2025. Stone for riprap must consist of clean field stone or rough unhewn quarry stone that meets West Virginia Department of Transportation Section 704.2 specifications and passes sodium sulfate soundness testing. Contractors are required to submit a verification letter regarding these specifications prior to delivery and must provide five business days’ notice to the government point of contact, Travis Adkins, before arriving on-site.
Delivery at Falls Mill is restricted to four truckloads per day across two specific morning and midday windows to minimize rehandling. Deliveries to Bulltown Campground must occur between 0800 and 1430 Eastern Time and do not have a daily quantity limit. These coordinated schedules allow the project time to secure rental equipment for stone placement.