Name | Type | Posted | Actions |
|---|---|---|---|
36C25526R0081 0004.docx | DOCX | May 29, 2026 | |
S04 Pre-Proposal Conference Attendance List 05182026.pdf | May 22, 2026 | ||
36C25526R0081 0003.docx | DOCX | May 15, 2026 | |
36C25526R0081 0002.docx | DOCX | May 13, 2026 | |
36C25526R0081 0001.docx | DOCX | May 6, 2026 | |
36C25526R0081.docx | DOCX | Apr 29, 2026 | |
Final Drawing.pdf | Apr 29, 2026 | ||
FINAL SPECS PG 01-129 589A6-26-449.pdf | Apr 29, 2026 |
Y1LZ--589A6-26-449, Resurface Campus Roads |ME (VA-26-00046776)
Contact and place of performance
Timothy V Parison
Not specified
Amendment A0003 589A6-26-449 Resurface Campus Roads, Leavenworth Questions 12-16 Final Questions 12. Can the VA clarify the exact proposal submission requirements? Specifically, are physical binders and a CD mandatory, or is a strictly electronic submission via email acceptable? Response: Follow the solicitation instructions. 13. Since the scope is limited to a 2" mill and overlay, how will the VA handle payment if t...
View moreThe Department of Veterans Affairs has issued solicitation 36C25526R0081 for the Resurface Campus Roads project at the Leavenworth campus. This requirement is classified under NAICS 236220, Commercial and Institutional Building Construction, and PSC Y1LZ, Construction of Parking Facilities. The project scope involves a two-inch mill and overlay of campus roads, the replacement of the concrete service court using expansion joints, and the application of latex paint for all new pavement markings. This procurement is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBC).
Administrative and technical requirements include the submission of resumes for all key personnel to ensure technical acceptability. The agency allows one qualified representative of the prime contractor to serve in no more than two dual-hat roles covering Superintendent, Site Safety and Health Officer (SSHO), and Quality Control Manager responsibilities. Regarding site conditions, the agency has indicated that unforeseen subgrade or base failures discovered after milling may be addressed through change orders rather than bid allowances.
The response deadline for this solicitation is May 27, 2026. The contracting office is managed by Timothy V. Parison, and the solicitation includes eight attachments, such as pre-proposal conference attendance lists and multiple amendments issued between April and May 2026. Submissions must follow the specific instructions provided within the solicitation documents regarding electronic or physical delivery.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.