Name | Type | Posted | Actions |
|---|---|---|---|
Bldg_117_Proposal_v1.pdf | May 8, 2026 | ||
RFI list BOM for building 117.pdf | May 8, 2026 | ||
BOM_Bldg 114 Gym Renovation Pricing Request.xlsx | XLSX | Apr 28, 2026 | |
W50S9E26QA003.pdf | Apr 28, 2026 | ||
https://dodprocurementtoolbox.com/ | LINK | Apr 27, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 27, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 27, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W50S9E26QA003¬iceType=CombinedSynopsisSolicitation | LINK | Apr 27, 2026 |
Construction building material purchase for building renovation located on Camp Murray, WA
Contact and place of performance
Ryan Dugan
Camp Murray, WA 98430
USA
This is for the purchase of building materials for the renovation of building 114 located at Camp Murray, WA. Material is required to be delivered before 15 June 2026. See Solicitation and attachment for full list and information.
Ammendment 1: Addition of RFI list with answers and building layout design.
The Department of the Army, through the W7N6 USPFO Activity WAANG 194, is soliciting the purchase of construction materials for the renovation of building 114 at Camp Murray, Washington. This procurement is identified as solicitation number W50S9E26QA003 and is classified under NAICS code 423390, Other Construction Material Merchant Wholesalers, and PSC 5680, Miscellaneous Construction Materials. This requirement is designated as an SBA Small Business Administration set-aside.
The scope of this acquisition involves the supply and delivery of building materials to support gym renovation projects on-site. All materials must be delivered to Camp Murray by June 15, 2026. Detailed lists of required materials, building layout designs, and answers to requests for information are provided across five attachments, including spreadsheets and building proposal documents.
Responses to this combined synopsis/solicitation are due by May 11, 2026. The primary point of contact for this requirement is Ryan Dugan. The solicitation was originally published on April 27, 2026, and was updated on May 8, 2026, to include an amendment with an RFI list and building layout specifications.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.