Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Apr 14, 2023 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 14, 2023 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 14, 2023 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123823R0035 | LINK | Apr 14, 2023 |
Dam Repair and Maintenance MATOC
Contact and place of performance
Ronald Arbour
Not specified
The U.S. Army Corps of Engineers, Sacramento District, SPK, has a requirement for Operations Division to provide dam repair and maintenance construction to include construction in recreational areas throughout California. The prime contractor (or its subcontractor) shall have all necessary Federal, State or Local Government licenses in the state where work will be performed. The scope of this acquisition includes pro...
View moreThe U.S. Army Corps of Engineers, Sacramento District, issued solicitation W9123823R0035 to establish a Multiple Award Task Order Contract (MATOC) for dam repair and maintenance construction services. This requirement supports the Operations Division and includes construction work at various federal dams and recreational areas throughout California administered by the Sacramento District. The acquisition is categorized under NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC Z1KA, Maintenance of Dams. This opportunity is designated as a Small Business Administration (SBA) set-aside.
The scope of the $30 million MATOC involves a wide range of repairs and component replacements, with individual task orders expected to average under $3 million each. Contracted work includes maintenance for structures such as emergency and service gates, Tainter radial gates, spillways, intake structures, and oxidation ponds. Technical services cover various systems including plumbing, electrical, hydraulic, and pump systems, as well as specialized tasks like concrete repair, painting, paint removal, and the maintenance of measuring and monitoring equipment. Prime contractors or their subcontractors must maintain all necessary federal, state, and local licenses required by the state where work is performed.
Published on April 14, 2023, and updated on April 27, 2023, this solicitation lists a response deadline of May 15, 2023. The contract vehicle is intended to address known requirements, historical trends, and future planning needs for the Sacramento District’s infrastructure. Ronald Arbour serves as the primary point of contact for this procurement, which includes no attachments in the initial posting.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.