Name | Type | Posted | Actions |
|---|---|---|---|
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W90VN725RA021 | LINK | Mar 4, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Mar 4, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 4, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 4, 2025 |
CY25 LCS, MATOC WP_ Repair Railroad, Various Area, Kunsan AB.
Contact and place of performance
KYONG KO
Not specified
AMENDMENT OF SOLICITATION_W90VN725RA021-0001THE PURPOSE OF THIS AMENDMENT IS TO REVISED SOW TO CHANGE THE WORDING BELOW.-FROM: ONLY CONCRETE CULVERT OR STEEL PIPE TYPES ARE ACCEPTABLE -TO: ONLY CONCRETE CULVERT IS ACCEPTABLE ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.**********************************************************************************************************************************************************************************CY25 LCS MATOC Work Plan, Repair Railroad, Various Area, Kunsan AB. The contractor shall provide all supervision, labor, tools, parts, materials and transportation necessary to provide service as stated in the Statement of Work and Drawings herein.
The Department of the Army, through the 630th Support Detachment, is soliciting services for the CY25 LCS MATOC Work Plan to repair railroads at various areas of Kunsan AB. Under solicitation W90VN725RA021, the contractor is responsible for providing all supervision, labor, tools, parts, materials, and transportation required to perform the repairs in accordance with the Statement of Work and associated drawings. A recent amendment to the solicitation specifies that only concrete culverts are acceptable for use, replacing a previous allowance for steel pipe types.
The procurement is classified under NAICS 324121, Asphalt Paving Mixture and Block Manufacturing, and PSC Z1AZ, Maintenance of Other Administrative Facilities and Service Buildings. No specific set-aside was identified in the notice metadata. Interested parties must submit their responses by the deadline of March 25, 2025. Kyong Ko serves as the primary point of contact for this combined synopsis/solicitation, which was published on March 4, 2025, and last updated on March 18, 2025.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.