No attachments available.
Program Management/Service Revealed Deficiency (PM/SRD) Component Improvement Program (CIP) R&D Engineering Services
Contact and place of performance
Andrea Czeck
Hill Air Force Base, UT 84056
USA
This is a new requirement (OEM is Collins Rome) for the F-15, F-16, B-1B, and B-2 power take off (PTO) shafts and power transmission shafts (PTS). This contract is to open lines of communication with this OEM and provide program management and engineering services which are required to support active aircraft in cases where Service Revealed Deficiencies (SRDs) are identified and quick action is required to resolve sa...
View moreThe Department of the Army, specifically the AFSC PZAAB1 office, has issued a pre-solicitation notice for Program Management/Service Revealed Deficiency (PM/SRD) Component Improvement Program (CIP) R&D Engineering Services. This new requirement supports power take-off (PTO) shafts and power transmission shafts (PTS) for the F-15, F-16, B-1B, and B-2 aircraft platforms. The primary purpose of the contract is to establish communication with the Original Equipment Manufacturer, Collins Rome, to provide critical engineering and management services for identifying and resolving Service Revealed Deficiencies. These services are intended to address safety and supply issues that could otherwise lead to grounded aircraft and unmet mission requirements.
The anticipated contract is a two-year Cost Plus Fixed Fee Research and Development Engineering Services agreement. Performance will take place at Hill Air Force Base, Utah, and includes four primary contract line items: Program Management, SRD, Travel, and Data. While foreign participation is restricted, all responsible sources may submit a capability statement, proposal, or quotation for consideration. The solicitation is identified under number PS-FA825226RB001 and is expected to result in an award on approximately September 30, 2026.
This procurement is classified under NAICS 541330 for Engineering Services and PSC R425 for SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICAL. There is no set-aside designated for this requirement (NONE). Interested parties must submit their responses by the deadline of June 26, 2026. The primary point of contact for this notice, which currently includes no attachments, is Andrea Czeck.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.