Name | Type | Posted | Actions |
|---|---|---|---|
140P8326Q0033-Amendment_0004__0004.pdf | Jun 3, 2026 | ||
Sol_140P8326Q0033_Amd_0004.pdf | Jun 3, 2026 | ||
Sol_140P8326Q0033_Amd_0003.pdf | May 27, 2026 | ||
Sol_140P8326Q0033_Amd_0002.pdf | May 18, 2026 | ||
Amendment_0001_Contractor_Questions_and_Answers_0001.pdf | May 14, 2026 | ||
Sol_140P8326Q0033_Amd_0001.pdf | May 14, 2026 | ||
Attachment_6_Lift_Station_General_Location_Map.pdf | Apr 29, 2026 | ||
Attachment_5_Seven_Bays_Lift_Station_Design_Drawing.pdf | Apr 29, 2026 | ||
Attachment_4_Seven_Bays_Reference_Photos.pdf | Apr 29, 2026 | ||
Attachment_12_FAR_52_204-24_Fill_In.docx | DOCX | Apr 29, 2026 | |
Attachment_3_Seven_Bays_Existing_Utility_Overview_Map.pdf | Apr 29, 2026 | ||
Attachment_2_Seven_Bays_Wastewater_Operation_Manual.pdf | Apr 29, 2026 | ||
Sol_140P8326Q0033.pdf | Apr 29, 2026 | ||
Attachment_1_As-Built_Construction_Drawings.pdf | Apr 29, 2026 | ||
Attachment_11_Technical_Approach.docx | DOCX | Apr 29, 2026 | |
Attachment_10_Relevant_Experience_Past_Performance.docx | DOCX | Apr 29, 2026 | |
Attachment_9_Wage_Determination.pdf | Apr 29, 2026 | ||
Attachment_8_PWS_LARO_Seven_Bays_Lift_Station_Repairs.pdf | Apr 29, 2026 | ||
Attachment_7_ABS_Piranha_PE45-2C_Manual.pdf | Apr 29, 2026 |
Z--LARO SEVEN BAYS LIFT STATION REPAIRS
Contact and place of performance
Abner, Michael
Not specified
Amendment 0004-Questions and Answers
The National Park Service is soliciting repairs for the Seven Bays lift station under solicitation number 140P8326Q0033. This project is classified under NAICS 237110, Water and Sewer Line and Related Structures Construction, and PSC Z2ND, REPAIR OR ALTERATION OF SEWAGE AND WASTE FACILITIES. The opportunity is designated as an SBA SBA set-aside.
The response deadline for this solicitation is June 5, 2026, and the primary point of contact is Michael Abner. The administrative record for the requirement includes 19 attachments, such as multiple amendments and documents detailing contractor questions and answers. The notice was originally published on April 29, 2026, and received its most recent update on June 3, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.