Name | Type | Posted | Actions |
|---|---|---|---|
Pre Solicitation Notice_Drainage 2026_updated_3.pdf | Apr 28, 2026 |
Repair & Maintain Airfield Stormwater System Phase II
Contact and place of performance
Kevin Song
Marietta, GA 30069
USA
While not all inclusive, this project encompasses the work necessary to repair the stormwater drainage systems east of Taxiway 'J' on Dobbins ARB. Areas where the slopes have failed or where they have been disturbed from previous repairs will be regraded and have sod applied to obtain stabilization and positive drainage. Work shall include all maintenance items identified in basin III, IV, and V on the airfie...
View moreThe Department of the Air Force, 94th Contracting Flight PK, issued pre-solicitation notice FGWB21000AB_1 for the second phase of repairs and maintenance to the airfield stormwater system at Dobbins Air Reserve Base in Marietta, Georgia. This requirement is classified under NAICS code 237110, Water and Sewer Line and Related Structures Construction, and PSC Z2NZ, REPAIR OR ALTERATION OF OTHER UTILITIES. Responses are due by July 7, 2026, and Kevin Song is the designated point of contact.
The project scope involves repairing stormwater drainage systems east of Taxiway J, specifically covering maintenance items identified in basins III, IV, and V. Work includes regrading failed or disturbed slopes and applying sod to achieve stabilization and positive drainage. Additionally, the selected contractor will clean existing flumes, pipes, and swales to reestablish proper drainage patterns and install new concrete flumes at various airfield locations to prevent future erosion and standing water. Documentation for this opportunity includes one PDF attachment posted on April 28, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.