Contact and place of performance
Melita Doyle
Layton, UT 84041
USA
Project Title: Plating Shop Renovation – Hill AFB, Utah Sponsor: U.S. Air Force Executing Agency: U.S. Army Corps of Engineers, Sacramento District (SPK) Project Type: Renovation and New Construction Delivery Method: Design-Bid-Build (DBB) Contract Type: Firm-Fixed Price (FFP), Single Award Task Order Contract (SATOC) Ordering Period: 1,825 calendar days (5 years) Bonding: Required at the task order level for a...
View moreThe event will:
Key USACE Staff Available: Project Manager, Technical Lead, Discipline Design Leads, Environmental Leads, and Contracting Officers.
Project Overview
The Plating Shop Renovation project will modernize and expand existing facilities located in Building 505 (B505) and Building 507 (B507) at Hill AFB, Utah, ensuring continued depot-level maintenance capability for multiple aircraft platforms. The renovation addresses compliance with OSHA and environmental standards, enhances safety and ergonomics, improves energy efficiency, reduces maintenance costs, and provides a robust, modernized facility to ensure reliable aircraft part finishing in support of Air Force readiness.
The project includes both the comprehensive renovation of 20,000 square feet of existing shop space and the construction of a new 2,800-square-foot Pre-Engineered Metal Building (PEMB) to accommodate expanded operations.
Renovation – Building 505/507 (20,000 SF)
Key Plating Processes:
New Construction – Pre-Engineered Metal Building (PEMB) (2,800 SF)
Ordering Period & Phased Construction Approach
Phased Construction Schedule:
Phase 1:
Phase 2:
Phase 3:
Phase 4:
Each task order includes labor, equipment, supervision, and materials and is issued within the 5-year ordering period.
Occupancy of Premises
Industry Day Details
RSVP Instructions:
Submit by 1200 PDT on 22 October 2025 with:
Email RSVP to:
Melita S. Doyle – [email protected]
Amelia K. Bryant – [email protected]
The U.S. Army Corps of Engineers, Sacramento District, is conducting a Special Notice for an Industry Day regarding the renovation and expansion of the Plating Shop at Hill Air Force Base in Layton, Utah. This project involves modernizing Buildings 505 and 507 to maintain depot-level maintenance capabilities for aircraft platforms while meeting OSHA and environmental standards. The scope includes the comprehensive renovation of 20,000 square feet of existing shop space and the construction of a new 2,800-square-foot Pre-Engineered Metal Building. Work is categorized under NAICS 236210, Industrial Building Construction, and PSC Z2EZ, Repair or Alteration of Other Industrial Buildings.
The project will be executed as a Design-Bid-Build, Firm-Fixed Price, Single Award Task Order Contract with an estimated construction magnitude between $100,000,000 and $250,000,000. The contract features a five-year ordering period to accommodate four distinct phases of demolition, equipment installation, and commissioning of various plating lines, including chrome, cadmium, and nickel processes. Renovation tasks include structural upgrades to basement slabs and roof structures, replacement of HVAC and chemical process ventilation, refurbishment of chemical-resistant coatings, and electrical upgrades to support automated operations.
Interested parties must submit an RSVP by October 22, 2025, to the primary point of contact, Melita Doyle. The Industry Day event is scheduled for November 7, 2025, and includes a briefing at the USACE Utah Layton Satellite Office followed by a site visit to Building 505. Administrative identifiers for this notice include two attachments: a sign-in sheet and a set of industry day presentation slides. All work will be performed in active, secure facilities, requiring contractors to coordinate with ongoing operations and provide dust enclosures during construction.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.