Name | Type | Posted | Actions |
|---|---|---|---|
210116_Pre-Bid RFI Answers.pdf | Jun 12, 2026 | ||
Att1_210116_Amendment 1 Drawings.pdf | Jun 12, 2026 | ||
Solicitation Amendment - FA813726R00240002.pdf | Jun 12, 2026 | ||
WWYK210116 Pre Bid RFI Q Contracting Answered.pdf | Jun 12, 2026 | ||
WWYK210116_Site_Visit Sign in.pdf | May 19, 2026 | ||
210116_Solicitation - FA813726R00240001.pdf | May 14, 2026 | ||
210116_Solicitation_FA813726R0024.pdf | Apr 27, 2026 | ||
Att13_210116_Drawings.pdf | Apr 27, 2026 | ||
Att12_210116_Submittal Register.pdf | Apr 27, 2026 | ||
Att10_210116_SOW MACB.pdf | Apr 27, 2026 | ||
210116_Wage_Determination.pdf | Apr 27, 2026 |
Tinker AFB MACBOA WWYK210116 Replace HVAC System, B285
The Air Force Sustainment Center at Tinker Air Force Base is seeking proposals for project WWYK210116 to replace the HVAC system in Building 285. This firm-fixed-price construction project is set aside for Small Business Multiple Award Construction Basic Ordering Agreement (MAC BOA) holders. The work follows a design-build model covering mechanical, electrical, architectural, and fire protection systems for the main building and its west addition. Only MAC BOA holders who attended the mandatory site visit on May 19, 2026, are eligible. The project is valued between $1,000,000 and $5,000,000 with a 365-day performance period. Recent amendments moved the proposal deadline to June 22, 2026, and added updated drawings and clauses for liquidated damages and Buy American requirements. Technical standards include independent HVAC commissioning and compliance with Unified Facilities Criteria (UFC) for fire protection and carbon monoxide detection. All work will take place at Tinker Air Force Base in Oklahoma. The project is governed by the base solicitation and two amendments. Amendment 0002 is the current authority, extending the deadline to June 22, 2026, and adding updated drawings and clauses. The package includes the SOW, drawings, submittal register, wage determinations, and RFI responses. Work must follow UFC 3-600-01 for fire protection and requires independent commissioning for all new HVAC equipment. Administrative compliance involves 83 submittal items, including safety plans and O&M manuals. All labor must comply with Davis-Bacon wage determinations for Oklahoma County.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Tamra Torres
S Coffeyville, OK 73145
USA
Update 01: June 12, 2026 Solicitaiton was amended to extend the offer due date from June 15, 2025, to June 22, 2026 Amended Drawings were attached below as well as additional clasuses RFO 52.240-93 and R-DFARS 252.240-7997, In relation to RFI Answer 30 and 31. Pre Bid RFI Q&A has been posted below as well. Only the MAC BOA Holder GCs that attended Site Visit on 19 MAY 2026 will be able to continue...
View moreUPDATE 02 5/14/2026
1) Solicitation Amendment FA813726R00240001
Created to add section L-Instructions to Offerors and M- Evaluation Factors for Award
This posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813726R0024
Project Title: WWYK210116 – REPLACE HVAC, B285
Project Location: Tinker AFB -B285
Repair the HVAC system at project location within B285 at Tinker Air Force Base (AFB) Oklahoma 73145
The estimated project value is between $1,000,000 and $5,000,000 and is restricted to SB MAC BOA holders only.
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 3 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
Only sevein individuals will be allowed per prime contractor.
Site visit date will be (19 May 2026) and RSVPs are due 15 May 2026. Calendar invite will be sent to only those who have RSVPd.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.