Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Aug 26, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Aug 26, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Aug 26, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911S225U1756¬iceType=CombinedSynopsisSolicitation | LINK | Aug 26, 2025 |
GOFF GRIT BLASTER PARTS
Contact and place of performance
David Fortune
74501
The following is a list of parts needed for several Goff grit blasters that are in use on the Plant. We have several different BC4 models. We are buying parts for 4 different grit blasters. They are two model BC4-15 serial numbers 18711-50-8310 and 18711-50-8311, one model BC4-25 serial number 19711-50-8427, and one model BC4-30 with S/N 03711-50-6649 for the purposes of ordering. The following is the list of parts:P...
View moreThe Department of the Army, MICC-Fort Drum, has issued a combined synopsis/solicitation under solicitation number W911S225U1756 for the procurement of specific replacement parts for Goff grit blasters. The requirement supports four different machines in use at the plant, including two model BC4-15 units, one model BC4-25, and one model BC4-30. This procurement is classified under NAICS 332993, Ammunition (except Small Arms) Manufacturing, and PSC 3690, Specialized Ammunition and Ordnance Machinery and Related Equipment. The acquisition is designated as an SBA set-aside.
The requested components comprise a variety of Goff-manufactured parts, including cast liners, blade blocks, flange nuts, hubs, and tune kits. Additional items include maintenance access components, blade sets, adapter tap lock bushings, cabinet auger assemblies, roll pins, valve control cylinders, grit valve kits, and hanger bearings. Quantities vary by part, ranging from single units for complex assemblies to 100 units for smaller hardware like flange nuts. Responses to this solicitation are due by September 8, 2025, and David Fortune serves as the primary point of contact for the requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.