Name | Type | Posted | Actions |
|---|---|---|---|
AMD 06_PPIs.pdf | May 18, 2026 | ||
General Requirements_B3147_ REV.1.pdf | May 15, 2026 | ||
AMD 02. Site Visit Log.pdf | May 15, 2026 | ||
AMD 03. PPIs.pdf | May 15, 2026 | ||
AMD 04. PPIs.pdf | May 15, 2026 | ||
AMD 05_PPIs.pdf | May 15, 2026 | ||
Attachment A - DBRFP REVISED.pdf | May 15, 2026 | ||
Attachment C - VA20250167 Mod 01.pdf | May 15, 2026 | ||
AMD 01. Rev. General Requirements.pdf | May 15, 2026 | ||
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 22, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=N4008526R0141¬iceType=SolicitationNotice | LINK | Apr 22, 2026 | |
https://dodprocurementtoolbox.com/ | LINK | Apr 22, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 22, 2026 |
REPLACE ROOF AT ROCKWELL HALL GYM, BUILDING 3147
Contact and place of performance
Chirine El Kaissi Johnson
Not specified
Please be advised that this opportunity is only open to Contractors on NAVFAC Mid ? Atlantic Small Business Multiple Award Construction Contract (MACC) ML-C00081 (Contract Nos. N4008524D0030 ? 0038, 0069).NOTICE REGARDING TIMELY DEFINITIZATION OF EQUITABLE ADJUSTMENTS FOR CHANGE ORDERS UNDER CONSTRUCTION CONTRACTS. There are no agency-specific policies and procedures that apply to the definitization of equitable adju...
View moreNAVFACSYSCOM Mid-Atlantic, a division of the Department of the Navy, is soliciting proposals for the replacement of the roof at Rockwell Hall Gym, Building 3147. Identified as solicitation number N4008526R0141, the project is classified under NAICS 236220 for Commercial and Institutional Building Construction and PSC Z2FB for the repair or alteration of recreational buildings. This procurement is restricted to contractors currently on the NAVFAC Mid-Atlantic Small Business Multiple Award Construction Contract (MACC) ML-C00081, encompassing contract numbers N4008524D0030 through 0038 and 0069.
The Department of the Navy has noted that no agency-specific policies or procedures apply to the definitization of equitable adjustments for change orders under construction contracts for this solicitation. In accordance with DFARS PGI 205.205(h)(i), current data regarding the timely definitization of such adjustments is available as of the solicitation date. The project documentation includes ten attachments, such as revised general requirements for Building 3147, site visit logs, and multiple sets of pre-proposal inquiries (PPIs).
Responses to this solicitation are due by May 20, 2026. Chirine El Kaissi Johnson is the primary point of contact for this requirement. The solicitation was originally published on April 22, 2026, and most recently updated on May 18, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.