No attachments available.
Sources Sought: Construct Combat Rescue Helicopter Simulator Facility at Moffett ANGB
Contact and place of performance
Paul (Nick) Ochs
LINDA, CA 94035
USA
This Sources Sought Solicitation is being issued in accordance with RFO FAR Part 10, Market Research . The purpose of this notice is to gain knowledge of potential sources for this project including interested Small Business Concerns. Its sole purpose is to provide information for planning and market research purposes only and shall not be construed as either a solicitation or obligation on the part of th...
View moreThis project will provide an approximately 8,202 gross square foot building consisting of a multi-story, high bay area to house the CRH-OFT simulator, with a single-story area containing CRH mission planning, briefing and debriefing rooms, administrative areas for training and support staff, OFT maintenance and parts storage rooms, secure and non-secure tele-communication rooms, latrine facilities and mechanical, electrical and utility support rooms utilizing conventional design and construction.
The building will be of permanent construction with electrical, mechanical, HVAC, plumbing, wet sprinkler fire suppression, fire detection, access control, direct digital control, and utility management. The exterior walls will be constructed with cavity wall construction including interior non-load bearing metal studs (or CMU wall backup at Simulator Bay) with gypsum board and exterior CMU veneer and metal panel. Air space and insulation to be located inside the cavity wall to meet Energy Code requirements. The primary roofing materials will be standing seam metal roofing to match other installation facilities and the perimeter sloped roof design will include a prefinished standing seam metal roof panel system over rigid insulation. The exterior walls will be constructed with cavity wall construction including interior non-load bearing metal studs (or CMU wall backup at Simulator Bay) with gypsum board and exterior CMU veneer and metal panel. Main entrance doors will be a pair of anodized aluminum storefront entrance doors with insulating glass including a sidelight. The Mechanical, Electrical, Sim Bay and secondary egress doors will be painted, insulated hollow metal door and frames with controlled access. Antiterrorism/Force Protection elements are incorporated. Supporting facilities include landscaping, utilities, pavements, storm drainage, sanitary sewer, site improvements, communications support, cybersecurity control systems, and tempest security.
The NAICS code for this requirement is 236220, Commercial and Institutional Building Construction. The Small Business Administration size standard for small businesses in this industry is $45,000,000.
Instructions to Interested Firms
All interested concerns should submit a written notice, not to exceed five (5) pages, stating the concern’s positive intention to submit a proposal as a prime contractor no later than the deadline posted with this notice. Responses to this Solicitation should include the following information:
If adequate small business firms are not available for adequate competition for this project, it may be advertised as an unrestricted solicitation.
Submit responses directly to [email protected]; telephone calls and facsimile responses will not be honored. Please reference the Notice ID and project title in the subject of your message. Please limit your responses to standard documents (i.e., Microsoft Office, Adobe PDF, etc.). Do not send compressed (i.e., .zip or .exe extension) or other file types as they will be stripped from your message.
The Department of the Army, specifically the USPFO Activity CAANG 129, has issued this sources sought notice for the construction of a Combat Rescue Helicopter (CRH) Operational Flight Trainer (OFT) simulator facility at Moffett Air National Guard Base in Mountain View, California. This market research effort aims to identify potential sources, including small business concerns, capable of providing all labor, materials, equipment, and supervision for the project. The magnitude of construction is estimated between $10,000,000 and $25,000,000. This requirement is classified under NAICS 236220, Commercial and Institutional Building Construction, and PSC Y1AZ, Construction of Other Administrative Facilities and Service Buildings.
The project scope involves constructing an approximately 8,202 gross square foot permanent building featuring a multi-story high bay for the simulator and a single-story section for mission planning, administrative staff, and maintenance rooms. Construction will utilize conventional design with cavity wall systems, CMU veneer, and standing seam metal roofing. The facility will include mechanical, electrical, and HVAC systems, fire suppression, access control, and cybersecurity control systems. Supporting site work includes landscaping, utilities, sanitary sewers, and pavements. Antiterrorism/Force Protection elements and tempest security measures are also required for the facility.
Interested firms must submit a written notice of intent no later than June 2, 2026. Submissions are limited to five pages and must include a statement of intent to act as a prime contractor, a list of relevant projects completed within the last five years, an outline of resources and key personnel, and documentation of the firm's socioeconomic status. While the government welcomes responses from all parties, this notice is for planning purposes only and does not constitute a formal solicitation. The designated point of contact for this notice is Paul (Nick) Ochs, and the place of performance is identified as Linda, California.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.