Name | Type | Posted | Actions |
|---|---|---|---|
Draft SOW_EA_SL2_MAY2026.pdf | Jun 15, 2026 | ||
SL2_SOW_ATCH A_ACRONYMS_ABBREVIATIONS.pdf | Jun 15, 2026 | ||
SL2_SOW_ATCH B_813.pdf | Jun 15, 2026 | ||
SL2_SOW ATCH C_DAF EIAP Format Guide.pdf | Jun 15, 2026 | ||
SL2_SOW_ATCH D_DOD NEPA PROC_JUN2025.pdf | Jun 15, 2026 | ||
SL2_SOW_ATCH E_DAF NEPA PROC_MAR2026.pdf | Jun 15, 2026 | ||
SL2_SOW_ATCH F_AR INSTRUCTIONS_2025.pdf | Jun 15, 2026 | ||
SL2_SOW ATCH G_DELIVERABLES TABLE.pdf | Jun 15, 2026 |
ENVIRONMENTAL ASSESSMENT FOR REPAIR OF OVERHEAD 70kV TRANSMISSION LINE South Loop 2 VSFB, CA
The Department of the Air Force is seeking capability statements for the preparation of an Environmental Assessment (EA) to support the repair of the South Loop 2 overhead 70kV transmission line at Vandenberg Space Force Base. The scope of work includes project management, data collection, and technical analysis of impacts on cultural and natural resources. The objective is to produce a legally sufficient EA document to support a Finding of No Significant Impact (FONSI), a mitigated FONSI, or a determination that an Environmental Impact Statement (EIS) is required. The contractor will coordinate with government and regulatory stakeholders while conducting technical analyses on wetlands, special status species, and construction noise. Key deliverables include a Description of Proposed Action and Alternatives (DOPAA) and various technical reports. This opportunity is set aside for small businesses under NAICS code 541620. Performance will take place at Vandenberg Space Force Base, requiring adherence to Department of the Air Force and Department of Defense National Environmental Policy Act (NEPA) implementing procedures. The Department of the Air Force requires an Environmental Assessment (EA) for the repair of the South Loop 2 (SL2) overhead 70kV transmission line at Vandenberg Space Force Base. The project follows NEPA and the Environmental Impact Analysis Process (EIAP) from data collection through the final decision document. The goal is a legally sufficient EA resulting in a Finding of No Significant Impact (FONSI), a mitigated FONSI, or a determination for an Environmental Impact Statement (EIS). Execution of Course of Action #2, involving overhead repair, rebuild, pole replacement, and 20-foot wide gravel road construction.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Chase French
CA 93437
USA
Based on the Statement of Work, the contractor will provide the services necessary to prepare a comprehensive Environmental Assessment (EA) for the repair of an overhead 70kV transmission line at Vandenberg Space Force Base. This includes project management, data collection, and extensive coordination with government and regulatory stakeholders. The core of the work involves conducting detailed technical analyses of...
View more