This is a pre-solicitation synopsis for a competitive solicitation that GPO intends to post on SAM.gov on or about May 11, 2026. The scope of work includes: The concrete sidewalk and the vault structure beneath the G Street Sidewalk are showing signs of moderate to severe deterioration of the concrete and the encased structural framing. Over time and a failure of the waterproofing membrane, salt water, and other liqu...
View morePre-Construction Tasks
Site Preparation & Demolition
Material Delivery & Logistics
Construction & Installation
Safety & Compliance
Quality Control & Inspections
Project Closeout
Period of Performace is eighteen (18) months from Notice to Proceed.
A site visit will be scheduled and listed in the solicitation.
The United States Government Publishing Office (GPO), Acquisition Services, issued this pre-solicitation notice under solicitation number 040ADV-26-R-0010 for the G-Street Sidewalk Repair project in Washington, DC. The requirement is categorized under NAICS 238190, Other Foundation, Structure, and Building Exterior Contractors, and PSC Z1AZ, Maintenance of Other Administrative Facilities and Service Buildings. The agency intends to post a competitive solicitation on or about May 11, 2026, and the notice includes one attachment titled SOW G Street Sidewalk.pdf. Troy D. White is the designated point of contact.
The scope of work involves addressing moderate to severe deterioration of the concrete sidewalk and the underlying vault structure caused by the failure of a waterproofing membrane. The contractor must provide all labor, material, equipment, and supervision to demolish and install a new sidewalk slab and renovate vault beams, concrete slabs, and columns to prevent water migration into the basement. Project tasks include obtaining permits and traffic control approvals, conducting selective demolition, installing structural components, and implementing weatherproofing systems. All work must align with the provided design drawings and specifications.
The period of performance for this project is 18 months from the issuance of the Notice to Proceed. Mandatory activities include pre-construction site walkthroughs, quality control inspections, and the submission of as-built drawings and safety plans. The contractor is also responsible for site restoration and the removal of temporary facilities upon completion. A site visit will be scheduled and detailed within the forthcoming solicitation.