Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | May 19, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | May 19, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | May 19, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W50S9526BA002¬iceType=SolicitationNotice | LINK | May 19, 2026 |
Repair and Widen Taxiways Phase III, PSTE 162013
Contact and place of performance
Jonathan Bailey
29044
This is an update to provide interested parties with information from the pre-bid solicitation conference and site visit conducted June 10, 2026. The list of attendees and the agency slideshow are included by attachment for reference purposes only. The USPFO for South Carolina intends to issue an Invitation for Bid to award a single firm fixed- price contract for services, non-personal, to provide all plant, labor, t...
View moreThe Department of the Army, specifically the USPFO Activity SCANG 169, is soliciting bids for the third phase of repairs and widening of taxiways at McEntire Joint National Guard Base in Richland County, South Carolina. This requirement, identified under solicitation number W50S9526BA002, involves a single firm-fixed-price contract for the removal of substandard concrete and asphaltic pavement and the installation of new base course, concrete pavement, and storm water drainage improvements. The project also includes relocating taxiway edge lights, updating signage, and painting taxi lines for assigned and transient aircraft. Optional line items include the replacement of all signs and lights and the resealing of the Ready Alert Apron.
This procurement is set aside 100% for Small Business (SBA) under NAICS 237310: Highway, Street, and Bridge Construction and PSC Z1BD: Maintenance of Airport Runways and Taxiways. The project magnitude is estimated between $10,000,000.00 and $25,000,000.00. The performance period is 365 days following the notice to proceed, divided into two distinct 180-day stages. The first stage covers pre-construction activities such as submittal approvals, testing, and permitting, while the second stage covers actual construction. Work on the second stage will not commence until the government formally accepts the first stage and issues a separate notice to proceed.
Interested parties must submit their responses by the deadline of June 23, 2026. Jonathan Bailey serves as the point of contact for this solicitation, which was originally published on May 19, 2026, and last updated on June 16, 2026. Available documentation includes a PDF attachment containing information from the pre-bid conference and site visit held on June 10, 2026. Bidders are required to comply with specific subcontracting limitations, ensuring that no more than 85 percent of the contract amount, excluding materials, is paid to subcontractors that are not similarly situated entities.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.