Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | May 7, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | May 7, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | May 7, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911S226U3201¬iceType=CombinedSynopsisSolicitation | LINK | May 7, 2026 |
Camp Natural Bridge Griddles
Contact and place of performance
Jason Lewis
10996
Amended to change NAICS. Heavy duty Propane gas griddle, stainless steel front, sides and front top ledge. Fully welded stainless and aluminized steel body frame. 11inch low profile cooking height on 6 inch legs.1 inch thick polished steel griddle plate with 12-gauge, 4inch stainless steel back and tapered side splashes ? Fully welded stainless and aluminized steel chassis frame ? 11 inch low profile cooking height o...
View moreThe Department of the Army, via MICC-FT Drum, issued combined synopsis/solicitation W911S226U3201 for the procurement and installation of heavy-duty propane gas griddles. This requirement is designated as an SBA (SBA) set-aside under NAICS 333241 Food Product Machinery Manufacturing and PSC 7310 FOOD COOKING, BAKING, AND SERVING EQUIPMENT. Submissions are due by May 15, 2026, directed to the point of contact, Jason Lewis.
The requested equipment consists of propane gas griddles featuring stainless steel construction, 1-inch thick polished steel plates, and a fully welded chassis. Technical specifications require 27,000 BTU/hr U-shaped burners for every 12 inches of width, snap-action thermostats adjustable up to 550 degrees Fahrenheit, and a pilot safety valve system for gas shutoff. The units must include 12-gauge stainless steel splashes, 6-quart grease drawers, and manual ignition components.
The scope of work includes the delivery of the new units to the first floor of a facility in West Point, New York, the removal of current griddles, and the complete installation and startup of the new equipment. Contractors are responsible for installing the provided propane gas pressure regulators during the setup process. One PDF attachment was published with the solicitation on May 7, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.