Name | Type | Posted | Actions |
|---|---|---|---|
C.04.01 Bid Opening Worksheet -09-19-2023.pdf | Sep 19, 2023 | ||
B.08.03 Solicitation 23B00020003.pdf | Sep 12, 2023 | ||
B.08.03 V6_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V2_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V1_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V10_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V11_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V3_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V9_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V8_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V4_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V5_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V12_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 VA_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 V7_23B0002_Plans_Amd003.pdf | Sep 12, 2023 | ||
B.08.03 TECHSPECS_23B0002_amd0003_McN Levee_8Sep23.pdf | Sep 12, 2023 | ||
B.08.03 DRAWING AMENDMENT APPROVAL FORM_0003.pdf | Sep 12, 2023 | ||
B.08.03 Solicitation 23B00020002.pdf | Aug 30, 2023 | ||
V6_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
B.08.02 Solicitation 23B00020001.pdf | Aug 22, 2023 | ||
TECHSPECS_23B0002_McN Levee Pump Stations_amd0001_21Aug23.pdf | Aug 22, 2023 | ||
V1_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V10_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V11_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V4_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V3_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V8_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V9_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V5_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
V7_23B0002_Plans_Amend001.pdf | Aug 22, 2023 | ||
MNA Levee Drainage Pumps site visit list.pdf | Aug 15, 2023 | ||
A.03.09 V7_23B0002_Plans_RE007_8__.pdf | Aug 9, 2023 | ||
B.08.02 Solicitation 23B0002.pdf | Aug 3, 2023 | ||
A.03.09 V10_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V12_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V06_23B0002_Plans~.pdf | Aug 3, 2023 | ||
A.03.09 V09_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V08_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V07_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V04_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V03_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V02_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V01_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 VA_23B0002_Plans.pdf | Aug 3, 2023 | ||
B.08.02 Solicitation 23B0002.pdf | Aug 3, 2023 | ||
A.02.12 TECHSPECS_23B0002_McN Levee Pump Stations_7Feb23.pdf | Aug 3, 2023 | ||
A.03.09 V11_23B0002_Plans.pdf | Aug 3, 2023 | ||
A.03.09 V05_23B0002_Plans.pdf | Aug 3, 2023 |
MNA Levee Drainage Pump Upgrade
Contact and place of performance
Chandra D. Crow
Pasco, WA 99301
USA
9/19/23: Updated to provide the bid opening worksheet. 9/12/23: Amendment 0003 is uploaded. This amendment changes multiple areas in the drawings and specifications, corrects the buy american act clauses, and amends the bid due date. 8/30/23: Amendment 0002 is uploaded. This amendment changes the acquisition from an intended firm-fixed-price award to a fixed-price with Economic Price Adjustment. Please see amendment...
View moreThe U.S. Army Corps of Engineers, Walla Walla District, issued this invitation for bid for the McNary Levee Drainage Pumps project under solicitation number W912EF23B0002. This requirement involves the upgrade of drainage pumps at multiple locations across Pasco, Richland, and Kennewick, Washington. Classified under NAICS 237110 Water and Sewer Line and Related Structures Construction and PSC Y1NE Construction of Water Supply Facilities, the project carries an estimated construction magnitude between $25,000,000 and $100,000,000. This procurement is a 100% Small Business (SBA) set-aside.
The contract is structured as a five-year construction requirements contract. While initially planned as firm-fixed-price, subsequent amendments transitioned the award type to fixed-price with Economic Price Adjustment. Performance and payment bonds of 100% are required for this project. The solicitation process included a site visit in August 2023 with specific security clearance protocols for foreign nationals.
The response deadline for this solicitation was September 19, 2023, coinciding with the publication of the bid opening worksheet. Administrative activity for this notice included three amendments that modified technical specifications, drawings, and Buy American Act clauses. Documentation for this opportunity consists of 48 attachments, including various plans, technical specifications, and solicitation amendments. Chandra D. Crow serves as the primary point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.