Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Jun 5, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jun 5, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jun 5, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912HP26RA026¬iceType=Presolicitation | LINK | Jun 5, 2026 |
FY26 ? Medical University of South Carolina (MUSC) Pump Upfit
Contact and place of performance
Evelyn HALLIBURTON
29403
PURPOSE OF THIS ANNOUNCEMENT: This announcement constitutes a pre-solicitation announcement of a proposed contract action pursuant to FAR 5.204. This is not a solicitation. No response is requested at this time. A formal solicitation will follow this announcement with full details, including a response deadline, the complete price proposal schedule, the construction plans and specifications, instructions to offerors,...
View moreThe Department of the Army, U.S. Army Corps of Engineers Charleston District, issued pre-solicitation notice W912HP26RA026 for the upfit of the Medical University of South Carolina (MUSC) stormwater pump station. This critical infrastructure project, located in the Charleston Medical District, is classified under NAICS 237110, Water and Sewer Line and Related Structures Construction, and PSC Y1NE, Construction of Water Supply Facilities. The estimated magnitude of the firm-fixed-price contract is between $5,000,000 and $10,000,000.
The project scope involves increasing pumping and discharge piping capacity to facilitate drainage in a topographic low point without a natural outlet. Proposed improvements include reconfiguring wet well and inflow chamber hydraulics, enclosing and conditioning the control room, and elevating all critical electrical and HVAC equipment above the design flood elevation. The work also includes upgrading electrical systems, instrumentation, and security; installing a new transformer and supporting pad; replacing wet well inflow pipes; and providing temporary pumps and piping to maintain station operations during construction. Minor grading, landscaping, and the replacement of a chain link gate are also required.
The formal solicitation is expected to be released between 15 and 30 days following the June 5, 2026, publication of this notice. Evelyn Halliburton is the designated point of contact for this requirement. One PDF attachment was included with the initial announcement metadata.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.