Name | Type | Posted | Actions |
|---|---|---|---|
36C25626R0047 0002.docx | DOCX | Jun 15, 2026 | |
Attachment No. 3 WD LA20260031.pdf | Jun 15, 2026 | ||
Attachment No. 2 Pre-bid Conference Sign-in Sheet.pdf | Jun 15, 2026 | ||
Attachment No. 1 Piping Asbestos Survey.pdf | Jun 15, 2026 | ||
36C25626R0047 0002.pdf | Jun 15, 2026 | ||
36C25626R0047 0001.pdf | May 20, 2026 | ||
WD LA20260031 01022026.pdf | May 19, 2026 | ||
Abate Central Chase - 8 - CRA.pdf | May 19, 2026 | ||
Abate Central Chase - 13 - ICRA.pdf | May 19, 2026 | ||
Abate Central Chase - 14 - Class II Precautions.pdf | May 19, 2026 | ||
36C25626R0047 EXHIBIT F.docx | DOCX | May 19, 2026 | |
Abate Chase - FY26 - Final Drawings.pdf | May 19, 2026 | ||
Abate Central Chase - 1- SOW.pdf | May 19, 2026 | ||
36C25626R0047.pdf | May 19, 2026 | ||
Abate Chase - FY26 - IFC Specs - Updated.pdf | May 19, 2026 | ||
36C25626R0047 EXHIBIT E.docx | DOCX | May 19, 2026 | |
36C25626R0047 EXHIBIT D.docx | DOCX | May 19, 2026 | |
36C25626R0047 EXHIBIT C.docx | DOCX | May 19, 2026 | |
36C25626R0047 EXHIBIT B.docx | DOCX | May 19, 2026 | |
36C25626R0047 EXHIBIT A.docx | DOCX | May 19, 2026 |
Z1DA--667-26-111 CON Abate Central Chase & Replace Fire Main
The Department of Veterans Affairs is soliciting proposals for project 667-26-111, which involves asbestos abatement in the central chase and replacement of the fire main at the Overton Brooks VA Medical Center in Shreveport, Louisiana. This requirement is a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside covering all labor, tools, materials, and supervision. The project magnitude is estimated between $2,000,000 and $5,000,000. Work includes a 200-calendar day performance period and follows a 7-phase execution sequence that limits construction to two floors at a time, progressing from the top down. Amendment 0002 specifies that the Superintendent, Quality Control Manager, and Safety and Health Officer must be three separate, full-time individuals. The central chase is a permit-required confined space, and abatement must occur after normal business hours. Technical requirements include a mandatory 7-phase top-down construction sequence and the maintenance of -0.02 negative air pressure during abatement. Amendment 0002 clarifies that the Superintendent, Quality Control Manager, and Site Safety and Health Officer must be three separate, full-time employees. Abatement of asbestos-containing materials within the central pipe chase of Building 1 at Overton Brooks VA Medical Center.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Andrea Payton
LA 71101
USA
Furnish all labor, tools, materials, equipment and supervision necessary to perform all work associated with project 667-26-111; Abate Central Chase & Replace Fire Main located at the Overton Brooks VA Medical Center in accordance with attached solicitation and attachments.