Name | Type | Posted | Actions |
|---|---|---|---|
W912EF22R0005 - 0003.pdf | Jul 1, 2022 | ||
W912EF22R0005 Attachment A.docx | DOCX | Jun 29, 2022 | |
W912EF22R0005 Attachment B.docx | DOCX | Jun 29, 2022 | |
DB-DBB MATOC Solicitation Amendment W912EF22R0005-0002.pdf | Jun 29, 2022 | ||
DB-DBB MATOC Solicitation Amendment W912EF22R0005-0001.pdf | Jun 16, 2022 | ||
W912EF22R0005 DB-DBB MATOC.pdf | Jun 3, 2022 |
Design Build MATOC
Contact and place of performance
LeAnne R. Walling
Walla Walla, WA 99362
USA
6/30/2022: Solicitation Amendment W912EF22R0005-0003 added. _______________________________________________________ 6/28/2022: Solicitation Amendment W912EF22R0005-0002 added. Addtionally, Word Forms of Attachment A and Attachment B are also provided. 6/16/22: Solicitation Amendment W912EF22R0005-0001 added. ___________________________________________________________________________________________ 6/3/2022 : DESIGN...
View moreThe U.S. Army Corps of Engineers, Walla Walla District, issued solicitation W912EF22R0005 for a Multiple Award Task Order Contract (MATOC) focused on design-build and design-bid-build services. This requirement encompasses the repair and maintenance of real property alongside construction services, including new construction and renovation for large civil works projects. Work involves flood control and hydroelectric dams, river navigation facilities, maintenance and office facilities, roadways, recreational facilities, and river levees. Projects may require a combination of design, construction, or repair services performed within the Walla Walla, Portland, Seattle, Kansas, and Omaha Districts.
This solicitation is designated under NAICS code 237990 for Other Heavy and Civil Engineering Construction and PSC code Z2KA for Repair or Alteration of Dams. The opportunity is designated as a Small Business Administration (SBA) set-aside. Proposals are due by July 7, 2022, for work primarily located in Walla Walla, Washington, and across the specified regional districts. LeAnne R. Walling serves as the primary point of contact for this requirement.
The solicitation was published on June 3, 2022, and was updated through July 1, 2022, with six total attachments. These include the original solicitation document, two versions of Attachment A and Attachment B in Word format, and three subsequent solicitation amendments. These documents detail the specific requirements for the design and construction tasks associated with the heavy and civil engineering projects managed by the agency.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.