Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Jun 11, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jun 11, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jun 11, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W50S8526BA005¬iceType=Presolicitation | LINK | Jun 11, 2026 |
VGLZ 242016 B164 HVAC REPAIR
Contact and place of performance
David Brown
48045
NOTE: This notice replaces Pre-solicitation Notice W50S8526BA002. The work shall be in strict compliance with the SOW, the project specifications, and the project drawings. Sections of the SOW may supersede the requirements found in the specifications, in which case, the more stringent/higher quality requirements will apply. The contractor shall schedule and perform a construction task for the replacement of the existing heating boiler systems and Roof Top Units (RTU) in Building 164 at the Selfridge Air National Guard Base, Harrison Twp. MI. The Contractor will provide complete and operable boiler and RTU systems at Building 164.
The Department of the Army, specifically the W7NF USPFO Activity MIANG 127, has issued this pre-solicitation notice for HVAC repair services under solicitation number W50S8526BA005. This requirement replaces a previous notice, W50S8526BA002, and is designated as an SBA Small Business Administration (SBA) set-aside. The project is classified under NAICS 238220, Plumbing, Heating, and Air-Conditioning Contractors, and PSC Z2NB, Repair or Alteration of Heating and Cooling Plants.
The scope of work involves a construction task for the replacement of existing heating boiler systems and Roof Top Units (RTU) in Building 164 at the Selfridge Air National Guard Base in Harrison Township, Michigan. The contractor is responsible for scheduling and performing all work to provide complete and operable boiler and RTU systems. Performance must adhere strictly to the Statement of Work, project specifications, and project drawings, with the most stringent or higher quality requirements taking precedence in the event of a conflict between documents.
Administrative details for this notice include a publication date of June 11, 2026, with David Brown serving as the point of contact. The solicitation documentation includes one unnamed PDF attachment released at the time of publication. All work must be executed according to the technical standards established in the project's formal specifications to ensure the facility's heating and cooling plants are fully restored to operational status.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.