Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Sep 18, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Sep 18, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Sep 18, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9126G25QA051¬iceType=SolicitationNotice | LINK | Sep 18, 2025 |
Trinity Region_Benbrook Lake_Water Well Monitoring
Contact and place of performance
Baisy Lanzo
Not specified
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform water system monitoring, drinking water sample collection, swim beach monitoring, and subsequent analysis at Benbrook Lake as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
The Department of the Army, specifically the U.S. Army Corps of Engineers Fort Worth District (W076 ENDIST FT WORTH), has issued solicitation W9126G25QA051 for water well monitoring services at Benbrook Lake. This requirement is designated as an SBA (Small Business Administration) set-aside. The project is classified under NAICS 541380, Testing Laboratories and Services, and PSC F103, Environmental Systems Protection - Water Quality Support.
The contractor is responsible for providing all personnel, equipment, supplies, facilities, transportation, tools, materials, and supervision required to perform water system monitoring and drinking water sample collection. The scope of work also includes swim beach monitoring and subsequent laboratory analysis to ensure compliance with performance standards. While the government will provide certain property and services as specified in the contract, the contractor must supply all other necessary non-personal services to maintain the water quality systems at the project site.
Responses for this solicitation are due by September 22, 2025. The primary point of contact for this requirement is Baisy Lanzo. As of the publication date of September 18, 2025, the notice contains no external attachments or documents. All performance must adhere to the standards defined within the Performance Work Statement for the Trinity Region.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.