Name | Type | Posted | Actions |
|---|---|---|---|
Sol_140P9726Q0045_Amd_0001.pdf | Jun 15, 2026 | ||
B03_Wage_Determination_2105-5687_Rev29_5_14_26_7pg.pdf | Jun 10, 2026 | ||
A06_Attachment_2_-_KATM_Boiler_CM-16_Submittal_Form_2pg.pdf | Jun 10, 2026 | ||
A06_Attachment_1_-_KATM_Boiler_Site_Photos_Rev13_pg.pdf | Jun 10, 2026 | ||
Sol_140P9726Q0045.pdf | Jun 10, 2026 |
45--KATMAI - REPLACE UP TO 6 BOILER SYSTEMS
The National Park Service is seeking quotes to replace up to six boiler and mechanical systems in residential housing at Katmai National Park, Alaska. The work is located at FAA Housing in King Salmon, specifically on Mosquito Coast and No See Em roads. This small business set-aside includes a base bid and five options for different residential units. The performance period runs from July 7, 2026, to August 31, 2027. Amendment 0001 notes that while no formal asbestos testing exists for the 1996-era boilers, they likely used non-asbestos materials. Submissions must include a price schedule, technical narrative, and references for a best-value tradeoff evaluation. The solicitation package includes technical and administrative documents, such as site photos of Beckett AFG Series burners and nameplates. Amendment 0001 notes that the 1996-era boilers likely do not contain asbestos, though no formal testing has been conducted. The performance period is July 7, 2026, to August 31, 2027. The National Park Service is replacing boiler and mechanical systems in six residential units at Katmai National Park in King Salmon, Alaska. This firm-fixed-price contract includes a base bid and five options (A-E). Work involves removing old equipment and installing new systems at sites on Mosquito Coast and No See Em roads.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Milson, Janet
Not specified
KATMAI NATIONAL PARK, ALASKA - REPLACE UP TO 6 BOILER SYSTEMS