Name | Type | Posted | Actions |
|---|---|---|---|
Tampa_OM_GDR2018-Cut1_2_Mullet-11July2025.pdf | May 20, 2026 | ||
W912EP26BA006TampaHarborMDEgmontFY26_Vol1Specs_RTA_20260518_Rev.pdf | May 20, 2026 | ||
W912EP26BA006TampaHarborMDEgmontFY26_Vol2Specs_RTA_20260508_Rev.pdf | May 20, 2026 | ||
W912EP26BA006_THMD26_FINAL_PLANS_RTA_20260421.pdf | May 20, 2026 | ||
https://dodprocurementtoolbox.com/ | LINK | May 18, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | May 18, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | May 18, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912EP26BA006¬iceType=SolicitationNotice | LINK | May 18, 2026 |
TAMPA HARBOR MAINTENANCE DREDGING EGMONT AND MULLET KEY CUTS, HILLSBOROUGH COUNTY, FL
The U.S. Army Corps of Engineers, Jacksonville District, is soliciting bids for maintenance dredging of the Tampa Harbor Egmont and Mullet Key Cuts. This Invitation for Bid (IFB) is for a firm fixed-price contract to remove material from Egmont Cut-1 through Mullet Key Cut with a one-foot allowable overdepth. The project includes a base requirement and two options, with an estimated value between $10,000,000 and $25,000,000. Dredging is to be performed with U.S. Coast Guard certified equipment. The scope includes turbidity monitoring, sea turtle trawling, environmental species monitoring, and vibration control. Responsibilities include Munitions and Explosives of Concern (MEC) support, screening, and tilling. Dredged material will be placed in the Beach Placement Area on Egmont Key. Work is expected to begin within 60 days of the notice to proceed, with a final completion date of December 31, 2026, if all options are exercised. Bids are due via the PIEE Solicitation Module by June 22, 2026. A pre-bid site visit is scheduled for May 28, 2026, followed by a virtual conference on May 29, 2026. The contract requires a 20% bid guarantee and includes liquidated damages of $2,885.00 per day. The scope includes maintenance dredging, sea turtle trawling, turbidity monitoring, and vibration control. Contractors must also provide Munitions and Explosives of Concern (MEC) support, including screening and tilling. All dredging equipment must be U.S. Coast Guard certified. Work starts within 60 days of the notice to proceed, with completion dates in late 2026 depending on which options are exercised. The project is divided into a base requirement and two options. The completion deadline is November 16, 2026, for the base work, extending to December 31, 2026, if all options are exe…
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Meredith Gonzalez
Not specified
DESCRIPTION OF WORK: The U.S. Army Corps of Engineers, Jacksonville District, intends to issue an Invitation for Bid (IFB) to award a single firm fixed-price contract. The project work consists of maintenance dredging within Egmont Cut-1 Through Mullet Key Cut. Incorporate 1 foot of allowable overdepth for all dredging areas. Place dredged material in the designated Beach Placement Area on Egmont Key. Additional work...
View more