Name | Type | Posted | Actions |
|---|---|---|---|
Sol_140R4026B0001_Amd_0004.pdf | Jun 11, 2026 | ||
Sol_140R4026B0001_Amd_0003.pdf | Jun 9, 2026 | ||
140R4026B0001_-_Solicitation_Amendment_0003_0003.pdf | Jun 9, 2026 | ||
Attachment_1_2_-_00_00_01A_NGWSP_BLK_2-3_Specifications_06092026_0003.pdf | Jun 9, 2026 | ||
Attachment_2_2_-_00_00_02_NGWSP_BLK_2-3_Drawings_06092026_0003.pdf | Jun 9, 2026 | ||
140R4026B0001_-_Questions_and_Answers_0002.pdf | Jun 1, 2026 | ||
Sol_140R4026B0001_Amd_0002.pdf | Jun 1, 2026 | ||
Attachment_1_1_-_00_00_01A_NGWSP_BLK_2-3_Specifications_05192026_0002.pdf | Jun 1, 2026 | ||
140R4026B0001_-_Solicitation_Amendment_002_0002.pdf | Jun 1, 2026 | ||
Attachment_2_1_-_00_00_02_NGWSP_BLK_2-3_Drawings_05182026_0002.pdf | Jun 1, 2026 | ||
Sol_140R4026B0001_Amd_0001.pdf | Apr 27, 2026 | ||
140R4026B0002_-_Solicitation_Amendment_1_0001.pdf | Apr 27, 2026 | ||
BLK_2-3_-_Site_Visit_Powerpoint_0001.pdf | Apr 27, 2026 | ||
BLK_2-3_-_Site_Visit_Sign_In_Sheet_0001.pdf | Apr 27, 2026 | ||
Attachment_6_-_WD_NM20260046_Building_-_San_Juan_County__NM.pdf | Apr 15, 2026 | ||
Sol_140R4026B0001.pdf | Apr 15, 2026 | ||
Attachment_3_-_00_00_02A_BLK_2-3_Geotech_Drawings_and_Logs.pdf | Apr 15, 2026 | ||
Attachment_2_-_00_00_02_NGWSP_BLK_2-3_Drawings.pdf | Apr 15, 2026 | ||
140R4026B0001_-_Solicitation.pdf | Apr 15, 2026 | ||
Attachment_5_-_WD_NM20260040_Heavy_-_San_Juan_County__NM.pdf | Apr 15, 2026 | ||
Attachment_4_-_Small_Business_Subcontracting_Plan.docx | DOCX | Apr 15, 2026 | |
Attachment_1_-_00_00_01A_NGWSP_BLK_2-3_Specifications.pdf | Apr 15, 2026 |
Y--NGWSP BLOCK 2-3 PIPELINE
Contact and place of performance
Spencer, Tyler
Not specified
NGWSP BLOCK 2-3 PIPELINE
The Bureau of Reclamation has issued solicitation 140R4026B0001 for the NGWSP Block 2-3 Pipeline project. This requirement involves the construction of water supply facilities, classified under NAICS 237110 for Water and Sewer Line and Related Structures Construction and PSC Y1NE for Construction of Water Supply Facilities. The project scope encompasses the installation of pipeline infrastructure as part of the Navajo-Gallup Water Supply Project.
Submissions are due by June 30, 2026. This solicitation is managed by the Bureau of Reclamation and has been updated through multiple amendments, as reflected in the 22 total attachments including specifications, drawings, and question-and-answer documents. Tyler Spencer is the designated point of contact for this federal opportunity.