Name | Type | Posted | Actions |
|---|---|---|---|
Solicitation Amendment FA489726Q00120002 SF 30.pdf | Jun 3, 2026 | ||
Solicitation Amendment FA489726Q00120001 SF 30.pdf | May 28, 2026 | ||
FA489726Q0012-Questions and Answers.pdf | May 28, 2026 | ||
03 366 SFS Form 30 (Installation Entry Pass Request) (Mar 25).pdf | May 15, 2026 | ||
02 AF 3000 Material Approval Submittal.pdf | May 15, 2026 | ||
01 Environment Protection Plan Section 01 57 19 MHAFB Env Spec 20180628.pdf | May 15, 2026 | ||
SOW - Replace Steam Boiler B2316.pdf | May 15, 2026 | ||
Solicitation - FA489726Q0012.pdf | May 15, 2026 | ||
REA.pdf | May 15, 2026 | ||
Wage Determination- Building.pdf | May 15, 2026 |
B2316 Steam Boiler Replacement
Contact and place of performance
Caleb Ferch
ID 83648
USA
Contractor is to provide all labor, materials, services, oversight, and direction to complete the construction/installation of the requirements identified in the Statement of Work (SOW) to replace the current 50 horsepower steam boiler with one 25 horsepower steam boiler at B2316, the Mountain Home AFB Dining Facility.
AMENDMENT:
Amendment 1: 28 May 26, Publish Questions and Answers.
Amendment 2: 3 June 26, Update to "Period for acceptance of offers".
The Department of the Air Force, specifically the 366th Contracting Squadron (366 CONS PKP), has issued solicitation FA489726Q0012 for the replacement of a steam boiler at Building 2316, the Mountain Home Air Force Base Dining Facility in Idaho. The selected contractor is responsible for providing all labor, materials, services, oversight, and direction necessary to remove the existing 50-horsepower steam boiler and install a new 25-horsepower steam boiler. This project falls under NAICS code 238220 for Plumbing, Heating, and Air-Conditioning Contractors and PSC N045 for the Installation of Equipment - Plumbing, Heating, and Waste Disposal Equipment.
This procurement is designated as an SBA Small Business Administration set-aside. Responses to the solicitation are due by June 9, 2026. The requirement includes 10 total attachments, such as two solicitation amendments, a questions and answers document, an environmental protection plan, a material approval submittal form, and an installation entry pass request. Caleb Ferch serves as the primary point of contact for this requirement, which was last updated on June 3, 2026, to reflect changes to the period for acceptance of offers.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.