Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Sep 18, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Sep 18, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Sep 18, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911KB25RA022¬iceType=SolicitationNotice | LINK | Sep 18, 2025 |
W911KB25RA022 - FTW507 REPAIR AIRFIELD STORM DRAIN SYSTEM, FORT WAINWRIGHT, ALASKA
Contact and place of performance
Mark Corn
99703
This is a Design-Build (DB) project for the Runway 7-25 (RW 7-25) infield area at Fort Wainwright, Alaska. The DB project includes a storm drain infiltration basin design and repair of the existing storm drain system, which currently experiences ponding water around the airfield. This ponding water becomes a bird attractant, which creates hazardous conditions for aircraft operating on RW 7-25. This infield drainage p...
View moreThe U.S. Department of the Army, through the Alaska District, is soliciting proposals for a two-phase design-build project to repair the airfield storm drain system at Fort Wainwright, Alaska. Under solicitation number W911KB25RA022, the project focuses on the Runway 7-25 infield area to mitigate ponding water that attracts birds and creates hazardous conditions for aircraft. The scope involves designing and constructing storm drain infiltration basins, replacing catch basins and manholes, and installing new storm drain pipes to improve existing drainage efficiency.
Construction activities include demolishing specific underground storm drain pipes and replacing the existing subgrade with permeable materials, such as cobblestone infiltration material. All work must comply with applicable United Facilities Criteria (UFC) and Federal Aviation Administration (FAA) regulations for drainage design, pipe installation, and basin construction. The requirement is classified under NAICS 237110, Water and Sewer Line and Related Structures Construction, and PSC Y1ND, Construction of Sewage and Waste Facilities.
This acquisition is a 100% Small Business Set-Aside (SBA) and will utilize a Best Value Trade-Off source selection process. Responses are due by October 20, 2025, and points of contact include Mark Corn. There are currently zero attachments associated with this solicitation notice, which was last updated on September 19, 2025.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.