Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | May 1, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | May 1, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | May 1, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9127826RA071¬iceType=SourcesSought | LINK | May 1, 2026 |
SAM?SAS?SAC BASLER ECS 2100 EXCITER RETROFIT
Contact and place of performance
Jaime Brown
Not specified
The U.S. Army Corps of Engineers (USACE) intends to upgrade and retrofit Basler ECS-2100 excitation control systems at four hydropower sites across the Savannah, Mobile, and Charleston Districts. The project includes engineering, design, manufacturing, factory testing, delivery, demolition, installation, integration, commissioning, training, and documentation to replace obsolete digital control hardware, improve reli...
View moreThe U.S. Army Corps of Engineers, Mobile District, is conducting market research under solicitation number W9127826RA071 to identify potential sources for the upgrade and retrofit of excitation control systems at four hydropower sites across the Savannah, Mobile, and Charleston Districts. The project scope includes the engineering, design, manufacturing, factory testing, delivery, demolition, installation, integration, commissioning, and training for Basler ECS-2100 excitation systems. Additionally, the requirement includes the full replacement of Prime Power/Siemens EX-1 excitation systems at select hydropower facilities to address hardware obsolescence and standardize technology across multiple powerhouses.
This acquisition is classified under NAICS code 237130, Power and Communication Line and Related Structures Construction, and PSC Z2MD, Repair or Alteration of EPG Facilities - Hydro. The primary objective of these services is to improve the reliability, maintainability, and diagnostic capabilities of the existing infrastructure through the modernization of digital control hardware. One PDF attachment was issued with the initial notice on May 1, 2026, providing further details on the scope of work and submission requirements.
Responses to this sources sought notice are due by May 26, 2026. Jaime Brown serves as the primary point of contact for this requirement. No specific set-aside designation was identified in the notice metadata. The project timeline and performance requirements focus on ensuring the operational integrity of critical electrical components within the designated Army Corps of Engineers districts.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.