Name | Type | Posted | Actions |
|---|---|---|---|
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jul 4, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jul 4, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912PL25RA023¬iceType=SolicitationNotice | LINK | Jul 4, 2025 | |
https://dodprocurementtoolbox.com/ | LINK | Jul 4, 2025 |
Nellis AFB Building 262 Hangar Addition / Alteration -? 100% Small Business Set-Aside
Contact and place of performance
Nardos Taeme
Not specified
Solicitation Notice: This is a One-Phase Design Build construction contract to repair an existing 1950s hangar at Nellis AFB for a new F-35 Air Maintenance Squadron. The work includes repairs to the hangar bay, administrative space modifications, structural upgrades, and a 4,062 GSF addition for support offices and related spaces. The solicitation will be prepared in accordance with FAR 15, and include evaluation fac...
View moreThe Department of the Army, through the U.S. Army Corps of Engineers Los Angeles District, has issued solicitation W912PL25RA023 for a one-phase design-build construction project at Nellis Air Force Base. This project involves the repair and alteration of an existing 1950s hangar to support a new F-35 Air Maintenance Squadron. Scope of work includes repairs to the hangar bay, modifications to administrative spaces, structural upgrades, and the construction of a 4,062 gross-square-foot addition for support offices and related facilities. The contract is a 100% Small Business Set-Aside (SBA) with an estimated magnitude of construction between $25,000,000 and $100,000,000.
The procurement is classified under NAICS code 236220 Commercial and Institutional Building Construction and PSC Z2BZ Repair or Alteration of Other Airfield Structures. This competitive Request for Proposal (RFP) will utilize Best Value Trade-Off procedures to award a firm-fixed-price contract. The period of performance is 720 calendar days following the receipt of the Notice to Proceed. In accordance with performance standards, the prime contractor must comply with limitations on subcontracting, ensuring no more than 85 percent of the amount paid by the government, excluding materials, is paid to subcontractors that are not similarly situated entities.
Proposals are due by August 15, 2025. Submissions must be processed through the Procurement Integrated Enterprise Environment (PIEE) System Solicitation Portal, and all offerors are required to maintain an active registration in the System for Award Management (SAM) database. The primary point of contact for this solicitation, which was published on July 4, 2025, and last updated on August 11, 2025, is Nardos Taeme. As of the latest update, the notice includes zero attachments.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.