Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Oct 16, 2024 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Oct 16, 2024 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912DR25R0004 | LINK | Oct 16, 2024 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Oct 16, 2024 |
Washington Aqueduct Mechanical Construction Services
Contact and place of performance
Vincent Gier
Not specified
The proposed Single Award Task Order Contract (SATOC) will allow for construction services for the repair or upgrade of mechanical equipment and infrastructure related to a complex water treatment facility. The awarded Contractor shall provide all management, supervision, labor, equipment, and materials necessary to perform construction, retrofitting or replacement related to mechanical work under negotiated Firm Fix...
View moreThe U.S. Army Corps of Engineers, Baltimore District, has issued solicitation W912DR25R0004 for mechanical construction services at the Washington Aqueduct. This requirement will be fulfilled through a Single Award Task Order Contract (SATOC) for the repair, upgrade, and retrofitting of mechanical equipment and infrastructure within a complex water treatment facility. The awarded contractor must provide all management, supervision, labor, equipment, and materials necessary to perform work under negotiated firm-fixed-price task orders.
The scope of services involves the renovation of industrial mechanical systems, including compressors, pumps, motors, pumping stations, and water mains. Additional requirements include the maintenance and repair of sluice gates, valves, fire alarm and extinguishing systems, and intrusion detection systems. The contractor will also be responsible for heating, ventilation, and air conditioning (HVAC) equipment, including ducts, controls, boxes, and wiring devices.
This procurement is classified under NAICS 237110, Water and Sewer Line and Related Structures Construction, and PSC Z2NE, Repair or Alteration of Water Supply Facilities. Responses to the solicitation are due by November 1, 2024. Vincent Gier serves as the point of contact for this requirement, which was published on October 16, 2024.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.