Name | Type | Posted | Actions |
|---|---|---|---|
PIEE Solicitation Module Link for FA860426RB011 | LINK | May 6, 2026 | |
Web based training for the PIEE solicitation module | LINK | May 6, 2026 | |
Registration instructions for the PIEE solicitation module | LINK | May 6, 2026 | |
Department of Defense Procurement Toolbox | LINK | May 6, 2026 | |
DFARS RFO Deviation Clauses Over SAT.pdf | May 6, 2026 | ||
NPT501-Contractor Information.pdf | May 6, 2026 | ||
NPT501- Appendix C - Mobile Storage System.pdf | May 6, 2026 | ||
Cover PD-Pittsburgh.pdf | May 6, 2026 | ||
NPT501- Appendix B - Pallet Rack.pdf | May 6, 2026 | ||
NPT501-02.pdf | May 6, 2026 | ||
NPT501- Appendix D - Rider Reach.pdf | May 6, 2026 | ||
NPT501-01.pdf | May 6, 2026 | ||
NPT501- Appendix A - Mezzanine.pdf | May 6, 2026 | ||
Addendums Pittsburgh.pdf | May 6, 2026 | ||
NPT501- Appendix E - Support Equipment.pdf | May 6, 2026 | ||
Solicitation - FA860426RB011.pdf | May 6, 2026 | ||
Checklist Summary Pricing Sheet Pittsburgh.pdf | May 6, 2026 | ||
Notification of Compliance with Contract Insurance Requirements Pittsburgh.pdf | May 6, 2026 |
Storage Aid System Pittsburgh ANGB
The Department of the Air Force, through the Air Force Life Cycle Management Center (AFLCMC), is seeking proposals for a mechanized materials handling and storage aid system at the Pittsburgh Air National Guard Base in Pennsylvania. This project involves the design, manufacturing, delivery, installation, and testing of a complete storage solution for Building 110. The acquisition is a small business set-aside and will be awarded based on a Lowest Price Technically Acceptable (LPTA) methodology. The scope is divided into 12 Contract Line Item Numbers (CLINs) covering mezzanine systems, pallet racks, mobile storage units, and rider reach vehicles. The total performance period is 240 days. Technical requirements are detailed across five appendices and two engineering drawings that specify facility constraints and performance standards. Proposals must be submitted electronically through the PIEE Solicitation Module by June 17, 2026, and must include sanitized and unsanitized technical volumes along with a cost proposal. Final system acceptance depends on a three-phase testing process: checkout, quality conformance, and a reliability demonstration. The scope includes mezzanine systems, pallet racks, mobile storage, and rider reach vehicles. Contractors are also responsible for site preparation, including the demolition of modular offices and existing racks, as well as necessary electrical reconfigurations. The project at Pittsburgh ANGB involves the design, fabrication, installation, and testing of a mechanized storage system in Building 110. This includes the demolition of existing modular offices, drop ceilings, and non-load-bearing walls to prepare the site. The contractor must provide all equipment, materials, and labor, and complete the work within a 240-day period.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Jennifer Jensen
PA 15108
USA
Amendment 0004 - Post additional RFI responses. No formal Amendment document added. Amendment 0003 - Update attachment 7 drawings, post RFI responses and extend proposal due date to 17 June 2026. Amendment 0002 - Extend proposal due date to 11 June 2026, 3PM EST and post RFI responses. Amendment 0001 - Update Attachment 11 - Checklist summery pricing sheet and attachment 14 - Technical Proposal Questionnaire. Storage...
View more