Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Apr 30, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Apr 30, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Apr 30, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912DQ25RA004¬iceType=AwardNotice | LINK | Apr 30, 2026 |
403873 FLW AIT Barracks Complex II Phase 2
Contact and place of performance
Dale Coleman
65473
****Update Jan 12, 2025***** Amendments 0005 incorporates answers to the questions from ProjNet and updates the Construction Wage Rates.****Update Nov 25, 2025**** Amendment 0004 removes the requirement for PLA and extends the due date to Jan 23, 2026****Update Nov 3, 2025**** Amendment 0003 extends the due date to Dec 4, 2025 while potential changes to the Div 00 specifications are developed****Update Oct 28, 2025**...
View moreThe Department of the Army, specifically the W071 ENDIST Kansas City, has issued an award notice under solicitation number W912DQ25RA004 for the construction of an Advanced Individual Training (AIT) Battalion Complex at Fort Leonard Wood. This project falls under NAICS 236220 for Commercial and Institutional Building Construction and PSC Y1FC for the Construction of Troop Housing Facilities. The scope involves constructing a standard design complex to support 600 Soldiers, featuring B/COF facilities for two companies, two lawn equipment buildings, and two physical training stations.
The construction requirements encompass various specialized systems, including tornado and storm protection measures, fire detection and sprinkler suppression, and information systems. Integrated energy monitoring and control systems connected to base monitoring are required, alongside intrusion detection, alarm systems, and antiterrorism/force protection measures. The project management included multiple amendments to address ProjNet inquiries, update construction wage rates, and modify specification requirements, such as the removal of a Project Labor Agreement requirement.
Administrative details for this notice include a publication date of April 30, 2026, with Dale Coleman serving as the point of contact. One PDF attachment was included with the notice at the time of publication. Technical documentation, including all drawings and specifications, was managed through the ProjNet Plan Room system during the solicitation phase.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.