Name | Type | Posted | Actions |
|---|---|---|---|
Revised_SOW.pdf | Jul 24, 2023 | ||
3629508_PKGRQMT_REPORT.pdf | Jul 7, 2023 | ||
3629510_TRNSPDATA_REPORT.pdf | Jul 7, 2023 | ||
CDRL-FD20302101527 01.pdf | Jul 7, 2023 | ||
DID-CAV-FD20302101527 01.pdf | Jul 7, 2023 | ||
3640882_SOW.pdf | Jul 7, 2023 | ||
DID-SURGE-FD20302101527 01.pdf | Jul 7, 2023 | ||
DID-CDM-FD20302101527 01.pdf | Jul 7, 2023 | ||
SOL-FA811823R0025.pdf | Jul 7, 2023 | ||
DID-GFP-FD20302101527 01.pdf | Jul 7, 2023 |
Remanufacture of B1B Spoiler Servo-Cylinders
Contact and place of performance
Morgan Graham
Not specified
A 5-YEAR BASIC WITH 5 ORDERING PERIODS, FIRM FIXED PRICE INDEFINITE DELIVERY INDEFINITE QUANTITY TYPE CONTRACT IS CONTEMPLATED. (a) A Pre-Award Survey and/or Initial Production Evaluation (IPE) may be required. Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively. (b) The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the remanuf...
View moreThe Department of the Air Force, via AFSC PZABB, has issued solicitation FA811823R0025 for the remanufacture of B1B Spoiler Servo-Cylinders. This acquisition is designated as an SBA Small Business Administration set-aside and is classified under NAICS 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing and PSC 1650 Aircraft Hydraulic, Vacuum, and De-icing System Components. The agency intends to award a firm-fixed-price, indefinite delivery indefinite quantity contract with a five-year basic period and five ordering periods. Responses to this solicitation are due by September 21, 2023.
The scope of work requires the contractor to provide all labor, facilities, materials, and expertise necessary to restore specific end items to a like-new condition. The requirement covers four National Stock Numbers: 1650-01-184-8758, 1650-01-183-5137, 1650-01-183-5252, and 1650-01-192-0675. Minimum quantities across these line items range from 5 to 8 units, with a maximum capacity of 250 units each over the five-year ordering period. Performance includes remanufacturing, packing, preservation, and Item Unique Identification marking. Contractors may be subject to a pre-award survey or initial production evaluation, and those not previously qualified must submit a source approval request.
Technical data and drawings are available to authorized vendors who provide a current, approved DD Form 2345. The solicitation includes ten attachments, such as a revised statement of work, packaging requirement reports, transportation data, and contract data requirements lists. The government will furnish property for repair, though contractors are responsible for securing long-lead parts and notifying the administrative contracting officer if units are determined to be beyond remanufacture limits. The contract also includes provisions for a potential surge option if requirements increase beyond the standard schedule.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.