NORTH BREAKWATER REPAIRS AT REDONDO BEACH-KING HARBOR
Contact and place of performance
Cameron Stokes
90277
The project will consist of repairs to a shore-connected, rubble-mound breakwater that provides protection from ocean waves to King Harbor in Redondo Beach, Los Angeles County, California. Repair work will consist of resetting of existing armor stone as needed and furnishing and placement of approximately 8,000 tons of new armor stone having a median stone size of 14-tons. There is an armor stone bench on the harbors...
View moreThe Department of the Army, specifically the U.S. Army Corps of Engineers Los Angeles District, is seeking bids for repairs to a shore-connected, rubble-mound breakwater at King Harbor in Redondo Beach, Los Angeles County, California. This project involves restoring the structure to its original design elevations and slopes by resetting existing armor stone and placing approximately 8,000 tons of new 14-ton median-sized armor stone. Repair work also includes a harborside armor stone bench situated at an elevation of +10.0 feet MLLW with a width of 8.0 feet. The estimated cost of the project is between $5,000,000 and $10,000,000, with an anticipated performance period of 210 calendar days.
This procurement is classified under NAICS 237990 for Other Heavy and Civil Engineering Construction and PSC Z2KZ for Repair or Alteration of Other Conservation and Development Facilities. The acquisition is conducted as an Unrestricted Sealed Bid under FAR Part 14. Large business offerors are required to submit a subcontracting plan if the award exceeds $1,500,000. Administrative amendments have updated the tentative solicitation issuance date to June 27, 2025, with a bid response deadline of July 29, 2025.
Solicitation W912PL25B0004 and all associated plans will be distributed electronically through the Procurement Integrated Enterprise Environment (PIEE). Cameron Stokes serves as the primary point of contact for this requirement. As of the latest update, there are no attachments associated with this pre-solicitation notice.