Name | Type | Posted | Actions |
|---|---|---|---|
Combined synopsis rev1.pdf | Apr 13, 2026 | ||
Combined synopsis.docx | DOCX | Mar 23, 2026 | |
Attachment 4 E-Invoicing Instructions.pdf | Mar 23, 2026 | ||
Attachment 3 Vendor pricing sheetTD208.xlsx | XLSX | Mar 23, 2026 | |
Attachment 2 TD208.Government Furnished Equipment List.pdf | Mar 23, 2026 | ||
Attachment 1 Statement of work.pdf | Mar 23, 2026 |
TD-208 Pusher Tug FY26 Dry Docking
Contact and place of performance
Mr. Cory Lynch
Norfolk, VA
USA
The subject vessel is owned by the United States of America acting through the Maritime Administration, Department of Transportation (herein after called MARAD). Barring any weather related or unforeseeable delays, MARAD intends for the patrol boat to be delivered and tendered to the contractor’s facility within three working days of notice to proceed. MARAD will deliver the TD208 to the contractor’s faci...
View moreThe Maritime Administration, an agency of the Department of Transportation, is soliciting dry-docking services for the TD-208 Pusher Tug under solicitation number 6933A226Q000005. This requirement is categorized under NAICS 336611 Ship Building and Repairing and PSC J020 MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT. The procurement is designated as an SBA (SBA) set-aside, and responses are due by April 30, 2026.
The contractor must provide a facility within the Hampton Roads area, including the James River, Elizabeth River branches, York River, Mobjack Bay, and their tributaries, to perform the work. MARAD will deliver the vessel to the facility within three working days of the notice to proceed, barring weather or unforeseeable delays. The dry-docking period of performance is 45 days upon completion of delivery and tender. MARAD intends to have a representative on-site during most production days and will take re-delivery of the vessel at the contractor's facility following the completion and acceptance of all work.
The project documentation includes six attachments: a statement of work, a government-furnished equipment list, a vendor pricing sheet, e-invoicing instructions, and two versions of the combined synopsis. Mr. Cory Lynch is the designated point of contact for this Norfolk, Virginia-based performance requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.