Name | Type | Posted | Actions |
|---|---|---|---|
Sol_140P8226B0005_Amd_0002.pdf | Jun 16, 2026 | ||
Sol_140P8226B0005_Amd_0001.pdf | Jun 12, 2026 | ||
B08_Attach_2_GFD__1_-_Aerial_Site_Map_2.pdf | May 18, 2026 | ||
B08_Attach_1_Construction_Specifications.pdf | May 18, 2026 | ||
B08_Attach_6_Performance_Bond_SF25-23a_Exp_2027.pdf | May 18, 2026 | ||
B08_Attach_5_Payment_Bond_SF25A-23a_Exp_2027.pdf | May 18, 2026 | ||
B08_Attach_7_WD_16_Jan_2026.pdf | May 18, 2026 | ||
Sol_140P8226B0005.pdf | May 18, 2026 | ||
B08_Attach_8_Contract_Bid_Schedule.docx | DOCX | May 18, 2026 | |
B08_Attach_3_GFD__2_-_Construction_Dwgs_474-80067.pdf | May 18, 2026 |
Z--WAPA REPLACE HVAC AT VC
The National Park Service is seeking sealed bids for a firm-fixed-price construction project to replace mechanical infrastructure at the War in the Pacific National Historical Park in Guam. The work involves removing existing equipment and installing a new 17.5-ton Package Cooling Unit at the T. Stell Newman Visitor Center. This requirement is a 100% small business set-aside under NAICS code 238220. The scope includes crane operations, technical submittals for safety and quality control, and adherence to architectural and electrical drawings. The performance period is 180 days, beginning July 1, 2026, and ending December 28, 2026. Bids must include a completed SF-1442, the Contract Bid Schedule, and required certifications by the June 17, 2026, deadline. The project documentation includes 34 construction drawings and Division 01 General Requirements covering demolition, site preparation, and safety. Amendment 0001 established a 180-day performance period from July 1, 2026, to December 28, 2026, and provided details for a virtual bid opening. The project involves replacing a failed 17.5-ton Package Cooling Unit (PCU #3) and its components at the T. Stell Newman Visitor Center in Guam. The contractor will remove and dispose of the existing unit and install a new system that fits the current concrete pads and ductwork.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Davidson, Michael
Not specified
WAPA REPLACE HVAC AT VC