Name | Type | Posted | Actions |
|---|---|---|---|
B03_Attachment_3_-_Davis_Bacon_Wage_Determination_VA20260007.pdf | May 15, 2026 | ||
B08_Attachment_2_-_GEWA_305342_-_Drawings.pdf | May 15, 2026 | ||
B08_Attachment_1_-_GEWA_305342_-_Specifications.pdf | May 15, 2026 | ||
B08_Attachment_6_-_Past_Performance_Questionnaire.pdf | May 15, 2026 | ||
B08_Attachment_4_-_Construction_Contract_Administration_Provision.pdf | May 15, 2026 | ||
B08_Attachment_5_-_Limitation_on_Subcontracting_Report.xlsx | XLSX | May 15, 2026 | |
Sol_140P4326R0013.pdf | May 15, 2026 |
George Washington Birthplace National Monument- RE
Contact and place of performance
McKenzie, Samuel
Colonial Beach, VA
George Washington Birthplace National Monument- Replace HVAC Equipment in the Memorial House Museum
The National Park Service has issued solicitation 140P4326R0013 for the replacement of HVAC equipment at the Memorial House Museum within the George Washington Birthplace National Monument. This project, located in Colonial Beach, Virginia, involves the installation of plumbing, heating, and waste disposal equipment. The procurement is designated as a Service-Disabled Veteran-Owned Small Business (SDVOSBC) set-aside.
The acquisition is classified under NAICS 238220, Plumbing, Heating, and Air-Conditioning Contractors, and PSC N045, Installation of Equipment- Plumbing, Heating, and Waste Disposal Equipment. Supporting documentation for the requirement includes seven attachments, featuring technical specifications, construction drawings, a Davis Bacon wage determination, and a past performance questionnaire. Samuel McKenzie serves as the primary point of contact for this solicitation.
Responses to this solicitation are due by June 26, 2026. The performance of all services and equipment installations will take place on-site at the Memorial House Museum. This notice follows the initial publication on May 15, 2026, and includes provisions for construction contract administration and limitations on subcontracting reporting.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.