Name | Type | Posted | Actions |
|---|---|---|---|
A21_Bid_Schedule_0002.docx | DOCX | Jun 16, 2026 | |
A04_SOW_0002.pdf | Jun 16, 2026 | ||
Sol_140FC326Q0033_Amd_0002.pdf | Jun 16, 2026 | ||
A21_Site_Visit_Informaiton_0001.pdf | Jun 16, 2026 | ||
Bid_Schedule_0001.docx | DOCX | Jun 16, 2026 | |
Sol_140FC326Q0033_Amd_0001.pdf | Jun 16, 2026 | ||
B01_Combined_Synopsis_and_Solicitation.pdf | Jun 16, 2026 | ||
Sol_140FC326Q0033.pdf | Jun 16, 2026 | ||
A04_SOW_6_12_26.pdf | Jun 16, 2026 | ||
B03_Wage_Determination.pdf | Jun 16, 2026 | ||
A06_Specifications_Fireguard_Product_Sheet.pdf | Jun 16, 2026 | ||
A06_Specifications_4000-0026-Fireguard-Horizontal-Storage-Tank-Manual-Fill-R.pdf | Jun 16, 2026 | ||
A06_Attachment_5_Above_Ground_Fuel_Storage_Checklist_STM_approved_24.pdf | Jun 16, 2026 |
Z--Remove and Replace Above Ground Fuel Storage Fuel
The U.S. Fish and Wildlife Service (FWS) is soliciting proposals for the removal and replacement of above-ground fuel storage tanks and pumps at the Central Washington National Wildlife Refuge (NWR) Complex. This project, managed by the FWS Construction & A/E - BIL/Disaster office, includes decommissioning existing systems and installing new infrastructure at Conboy Lake NWR, Columbia NWR, and the Hanford Reach ALE Unit. The procurement is a small business set-aside under NAICS 237120, with an estimated value between $25,000 and $60,000. Requirements include the installation of UL-2085 listed tanks and manual pump accessories. The period of performance runs from July 30, 2026, to July 30, 2027. Evaluation will follow the Lowest Price Technically Acceptable (LPTA) process, requiring technical data such as manufacturer specifications and UL listings. The U.S. Fish and Wildlife Service (FWS) is seeking a contractor to remove and replace above-ground fuel storage tanks at three locations within the Central Washington National Wildlife Refuge Complex. This small business set-aside uses FAR Part 12 and 13 procedures for commercial items, with selection based on the Lowest Price Technically Acceptable (LPTA) criteria. The project involves removing and replacing above-ground fuel storage tanks (ASTs) and associated equipment at Conboy Lake NWR, Columbia NWR, and the Hanford Reach ALE Unit. Work includes six base tasks and two optional tasks covering the decommissioning of old systems and the installation of new UL-2085 listed tanks.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Malveaux, Tariq
Not specified
Remove and Replace Above Ground Fuel Storage Fuel Tanks, Pumps, and Removal Actions