Barkley Emergency Gate Machinery Inspection
Contact and place of performance
ROBERT ELLIS
42045
Contractor shall provide all labor, material, and equipment necessary to clean, disassemble/reassemble, and inspect all lifting machinery for the Barkley Lock Emergency Lift Gate, including but not limited to the limit switch assemblies, motors, enclosed gears, open gears, gear mounting assemblies, drums, sheaves, wire rope, brakes, shaft bearings, couplings, and control equipment. Provide the initial inspection repo...
View moreThe Department of the Army, U.S. Army Corps of Engineers Nashville District, issued this combined synopsis/solicitation under solicitation number W912P526QA023 for the inspection of machinery at the Barkley Lock Emergency Lift Gate. The contractor must provide all labor, material, and equipment to clean, disassemble, reassemble, and inspect various components including limit switch assemblies, motors, gears, mounting assemblies, drums, sheaves, wire rope, brakes, shaft bearings, couplings, and control equipment. The scope includes providing initial inspection reports with photographic documentation of deficiencies, performing touch-up painting on exterior surfaces, and supplying new oil, grease, filters, fasteners, and keys to return the machinery to operational status.
Required deliverables include initial inspection reports and final as-built reports detailing fits, backlashes, contact patterns, and end floats for all open gears, limit switch assemblies, and enclosed gears. If specific contract options are exercised, the contractor will also be responsible for painting respective components after completing the associated work. This requirement is classified under NAICS 811310 for Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance and PSC J039 for Maintenance, Repair, and Rebuild of Equipment- Materials Handling Equipment.
The response deadline for this opportunity is July 10, 2026. Robert Ellis is the designated point of contact for the procurement, which was published on June 10, 2026. One PDF attachment was included with the original notice.