TDA Auxiliary Water Supply Backup Debris Management
Contact and place of performance
David Cook
Lyle, WA 98635
USA
The U.S. Army Corps of Engineer (USACE) Portland District (NWP) intends to solicit construction firms who are interested in submitting a competitive firm-fixed-price bid for this project. This PRESOLICITATION notice for the The Dallas Lock and Dam (TDA) Auxiliary Water Supply Backup Debris Management. Project Background. The Dalles Lock & Dam is 192 miles from the mouth of the Columbia River near the city of...
View moreProject Scope. This project is a Design-Bid-Build construction requirement which will provide a predesigned mechanical method for dislodging debris from the trashracks at the EFL AWSB system intake. This will remove the need for operations staff to shut down the AWSB system to let river currents clear accumulated debris from the screens.
The predesigned AWSB Intake trashrack cleaning system is based on a telescoping boom mounted rotating bristle brush and includes the following:
Anticipated Construction Schedule: CENWP intends to advertise in late June/early July 2026 and award in September 2026. Construction Contract with estimated construction completion by the end of calendar year 2028.
Estimated Construction Cost (ECC): The current ECC is between $1,000,000.00 and $5,000,000.00.
Number and Type of Contracts: NWP contemplates awarding one (1), Firm Fixed-Price contract.
The acquisition strategy decision: 100% Small Business Set-Aside
Anticipated Source Selection Process: The expected method to determine the best value to the government is Invitation for Bid.
Bid Procedures: The solicitation will be posted on SAM.GOV website once it is issued.
Plans and Specifications: The Plans and Specifications will also be posted on beta.SAM.gov website once it is issued.
System for Award Management (SAM): Offerors must register in the SAM at: https://www.sam.gov/portal/public/SAM/ prior to submission of bids and prior to receiving an award.
Cybersecurity Maturity Model Certification (CMMC) level: The CMMC level anticipated for this requirement is CMMC Level 2 (Self). This CMMC level, or higher (see 32 CFR part 170), will be required prior to award and maintained for the duration of the contract for each contractor information system that will process, store, or transmit Federal contract information (FCI) or controlled unclassified information (CUI) during performance of the contract.
THIS PRE-SOLICITATION NOTICE IS FOR THE PURPOSE OF INFORMING INDUSTRY THAT THIS SOLICITATION WILL BE POSTED ON SAM.GOV IN LATE JUNE/EARLY JULY 2026. THIS NOTICE IS NOT AN INVITATION FOR BIDS, AND ANY BIDS RECEIVED AS A RESULT OF THIS PRE-SOLICITATION NOTICE WILL NOT BE ACCEPTED OR EVALUATED.
THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.
The Department of the Army, USACE Portland District (NWP), is issuing this pre-solicitation notice for the Auxiliary Water Supply Backup (AWSB) Debris Management project at The Dalles Lock and Dam in Lyle, Washington. This Design-Bid-Build requirement involves installing a predesigned mechanical cleaning system to dislodge debris from trashracks at the East Fish Ladder AWSB intake. The scope includes a telescoping boom-mounted rotating bristle brush, fixed and traveling operator platforms anchored to the intake concrete wall, and electrical power and data systems routed from the dam’s service gallery. The mechanical equipment will be sourced from an existing product line, and the contractor must coordinate mounting and installation details with the equipment supplier while performing necessary pavement repairs and trenching for power and controls.
The government intends to award a single firm-fixed-price contract through an Invitation for Bid process. This procurement is designated as a 100% Small Business Set-Aside (SBA) under NAICS code 237990, Other Heavy and Civil Engineering Construction, and PSC Z2KZ, Repair or Alteration of Other Conservation and Development Facilities. The estimated construction cost is between $1,000,000.00 and $5,000,000.00. Contractors must be registered in the System for Award Management and meet Cybersecurity Maturity Model Certification (CMMC) Level 2 requirements to process, store, or transmit Federal contract information or controlled unclassified information during the performance period.
Solicitation W9127N26BA019 is expected to be advertised in late June or early July 2026, with a response deadline of June 28, 2026. The agency anticipates awarding the contract in September 2026, with a performance period concluding by the end of the 2028 calendar year. David Cook serves as the point of contact for this requirement. Information regarding this notice was published on June 12, 2026, and is identified under source URL 3fc2f7313dfd46f2aad20ec8e05fd66c.